Related papers: Fermilab Program and Plans
In order to meet the needs of Fermilabs planned post-collider experimental program, the total proton throughput of the 8 GeV Booster accelerator must be nearly doubled within the next two years. A system of 48 ramped corrector magnets has…
Significant upgrades to Fermilab's accelerator complex have accompanied the development of LBNF (the Long Baseline Neutrino Facility) and DUNE (Deep Underground Neutrino Experiment). These improvements will facilitate 1-MW operation of the…
Precise, accurate neutrino flux predictions for neutrino beam experiments are crucial for physics results. Flux predictions for the Booster Neutrino Beam at Fermilab were first published in 2009 by the MiniBooNE collaboration. It is no…
Mature technology of Liquid Argon Time Projection Chambers in conjunction with intense neutrino beams constructed at Fermilab offer a broad program of neutrino physics for the next decade.
The PIP2IT test accelerator is under construction at Fermilab. Its ion source and Low Energy Beam Transport (LEBT) in its initial (straight) configuration have been commissioned to full specification parameters. This paper introduces the…
The radiation hardened beam instrumentations workshop was held on February 3rd and 4th, 2022 to identify the technological challenges on the beam instrumentation for multi-Mega-Watt (MW) beam facilities. We invited a speaker from a high…
We report results of the beam commissioning and first operation of the 1.3 GHz superconducting RF electron linear accelerator at Fermilab Accelerator Science and Technology (FAST) facility. Construction of the linac was completed and the…
The current status of the Short Baseline Neutrino (SBN) project at Fermilab is reviewed. While the installation of SBND is still in progress, ICARUS has taken its first neutrino data on beam: using both the Booster Neutrino Beam (BNB) and…
Fermilab operates several clusters for lattice gauge computing. Minimal manpower is available to manage these clusters. We have written a number of tools and developed techniques to cope with this task. We describe our tools which use the…
This document is the second in a series of reports on the exciting physics that would be accessible at Fermilab in the event of an upgraded proton source. Where the first report covered a broad range of topics, this report focuses…
An integrated program is described, starting with muon experiments in the Booster era, continuing with a 2 MW target station, a 4 GeV Neutrino Factory and a 3 TeV Muon Collider, all driven by Project X. This idea provides an integrated…
The Fermilab Proton Improvement Plan II, or PIP-II, would enable the world's most intense high-energy neutrino beam and would help scientists search for rare particle physics processes. The PIP-II goal is to deliver 1.2 MW of proton beam…
The Fermilab accelerator complex delivers intense high-energy proton beams to a variety of fixed-target scientific programs, including a flagship long-baseline neutrino program. With the advent of the Deep Underground Neutrino Experiment…
The Snowmass report on rare processes and precision measurements recommended Mu2e-II and a next generation muon facility at Fermilab (Advanced Muon Facility) as priorities for the frontier. The Workshop on a future muon program at FNAL was…
The use of existing Fermilab facilities to provide beams for two muon experiments -- the Muon to Electron Conversion Experiment (Mu2e) and the New g-2 Experiment -- is under consideration. Plans are being pursued to perform these…
Recent performance of Fermilab's Tevatron has exceeded this year's design goals and further accelerator upgrades are underway. The high-luminosity period which follows these improvements is known as Run IIb. The D0 experiment is in the…
A staged approach towards muon based facilities for Intensity and Energy Frontier science, building upon existing and proposed facilities at Fermilab, is presented. At each stage, a facility exploring new physics also provides an R&D…
The US ITER Research Program Basic Research Needs Workshop, held over the course of several months in 2022 with over 400 participants, sought to identify steps to be taken to both maximize the return of the US investment in ITER…
This document summarizes the findings of the Accelerator Working Group (AWG) of the International Scoping Study (ISS) of a Future Neutrino Factory and super-beam Facility. The work of the group took place at three plenary meetings along…
Fermilab is developing a compact superconducting CSRF accelerator as a source of a high-power, high-energy electron beam to produce an x-ray beam comparable to $\geq$ 2 MCi of cobalt-60. As part of this development, we are presently…