The Jefferson Lab facilities have undergone a substantial upgrade, both of accelerator, CEBAF, and of the experimental installations. We will discuss the progress to completion of these facilities, the status of accelerator commissioning,…
At the end of its operations in 2011, the Fermilab antiproton production complex consisted of a sophisticated target system, three 8-GeV storage rings (namely the Debuncher, the Accumulator and the Recycler), 25 independent multi-GHz…
A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under…
This paper presents the final physics design of the Proton Improvement Plan-II (PIP-II) at Fermilab, focusing on the linear accelerator (Linac) and its beam transfer line. We address the challenges in longitudinal and transverse lattice…
Fermilab operates the world's most intense source of antiprotons. Recently various experiments have been proposed that can use those antiprotons either parasitically during Tevatron Collider running or after the Tevatron Collider finishes…
The second workshop to discuss the development of liquid argon time projection chambers (LArTPCs) in the United States was held at Fermilab on July 8-9, 2014. The workshop was organized under the auspices of the Coordinating Panel for…
Fermilab has long had the world's most intense antiproton source, but the opportunities for medium-energy antiproton physics have been limited, and those for low-energy antiproton physics nonexistent. The conclusion of E835 brings this era…
The 2014 P5 report indicated the accelerator-based neutrino and rare decay physics research as a centrepiece of the US domestic HEP program. Operation, upgrade and development of the accelerators for the near-term and longer-term particle…
We present the current and planned beam physics research program and accelerator education program at Advanced Superconducting Test Accelerator (ASTA) at Fermilab.
The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour, which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is…
We describe the physics capabilites and status of the MIPP experiment which is scheduled to enter its physics data taking period during December 2004-July 2005. We show some of the results obtained from the engineering run that concluded in…
The Integrable Optics Test Accelerator (IOTA) at the Fermilab Accelerator Science & Technology (FAST) Facility is beginning operations, with an experimental program aimed at developing technology to enable future high intensity particle…
We describe the status of the Main Injector particle production Experiment (MIPP) at Fermilab which has to date acquired 18 million events of particle interactions using (5 GeV/c-120 GeV/c) $\pi^\pm, K^\pm$ and $p^\pm$ beams on various…
Fermilab is planning the construction of a prototype front end of the Project X linac. The Project X Injector Experiment (PXIE) is expected to accelerate 1 mA cw H- beam up to 30 MeV. Some of the major goals of the project are to test a cw…
The Fermilab Booster is being upgraded under the Proton Improvement Plan (PIP) to be capable of providing a proton flux of $2.25^{17}$ protons per hour. The intensity per cycle will remain at the present operational $4.3^{12}$ protons per…
This document is an abridgement of the commemorative book prepared on the occasion of the symposium "In Celebration of the Fixed Target Program with the Tevatron" held at Fermilab on June 2, 2000. The full text with graphics contains, in…
The Elastic Analysis Facility (EAF) hosted at Fermi National Accelerator Laboratory (Fermilab) is a platform being developed with the goal of providing a fast and efficient facility for physics analysis. As high-energy physics moves towards…
SNOLAB hosts a biannual Future Projects Workshop (FPW) with the goal of encouraging future project stakeholders to present ideas, concepts, and needs for experiments or programs that could one day be hosted at SNOLAB. The 2025 FPW was held…
The project to upgrade the CEBAF accelerator at Jefferson Lab to 12 GeV is presented. Most of the research program supporting that upgrade, will require a highly polarized beam, as will be illustrated by a few selected examples. To carry…
The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging and often depends on non-invasive techniques. One such…