The N-1-1 contingency criterion considers the con- secutive loss of two components in a power system, with intervening time for system adjustments. In this paper, we consider the problem of optimizing generation unit commitment (UC) while…
We consider the problem of designing (or augmenting) an electric power system at a minimum cost such that it satisfies the N-k-e survivability criterion. This survivability criterion is a generalization of the well-known N-k criterion, and…
As renewable wind energy penetration rates continue to increase, one of the major challenges facing grid operators is the question of how to control transmission grids in a reliable and a cost-efficient manner. The stochastic nature of wind…
Keeping the balance between supply and demand is a fundamental task in power system operational planning practices. This task becomes particularly challenging due to the deepening penetration of renewable energy resources, which induces a…
As renewable wind energy penetration rates continue to increase, one of the major challenges facing grid operators is the question of how to control transmission grids in a reliable and a cost-efficient manner. The stochastic nature of wind…
We consider the problem of designing (or augmenting) an electric power system such that it satisfies the N-k-e survivability criterion while minimizing total cost. The survivability criterion requires that at least (1-e) fraction of the…
In the face of extreme events, e.g., hurricanes, the transmission systems, especially the transmission lines, are affected across time and space. To mitigate these impacts on the day-ahead market from a probabilistic perspective, a…
Current contingency reserve criteria ignore the likelihood of individual contingencies and, thus, their impact on system reliability and risk. This paper develops an iterative approach, inspired by the current security-constrained unit…
The Unit Commitment (UC) problem is a key optimization task in power systems to forecast the generation schedules of power units over a finite time period by minimizing costs while meeting demand and technical constraints. However, many…
To capture the stochastic characteristics of renewable energy generation output, the chance-constrained unit commitment (CCUC) model is widely used. Conventionally, analytical solution for CCUC is usually based on simplified probability…
This paper addresses two vital issues which are barely discussed in the literature on robust unit commitment (RUC): 1) how much the potential operational loss could be if the realization of uncertainty is beyond the prescribed uncertainty…
Currently, system operators implement demand response by dispatching controllable loads for economic reasons in day-ahead scheduling. Particularly, demand shifting from peak hours when the cost of electricity is higher to non-peak hours to…
Optimization models have been broadly used within side the energy industry as useful decision-making systems for scheduling and dispatching electric powered energy resources; this is applied in a system called unit commitment (UC). Unit…
Security-constrained unit commitment (SCUC) model is used for power system day-ahead scheduling. However, current SCUC model uses a static network to deliver power and meet demand optimally. A dynamic network can provide a lower optimal…
Power systems Unit Commitment (UC) problem determines the generator commitment schedule and dispatch decisions for power networks based on forecasted electricity demand. However, with the increasing penetration of renewables and stochastic…
Incorporating the AC power flow equations into unit commitment models has the potential to avoid costly corrective actions required by less accurate power flow approximations. However, research on unit commitment with AC power flow…
Power systems Unit Commitment (UC) problem determines the generator commitment schedule and dispatch decisions to realize the reliable and economic operation of power networks. The growing penetration of stochastic renewables and demand…
The transmission-constrained unit commitment (TC-UC) problem is one of the most relevant problems solved by independent system operators for the daily operation of power systems. Given its computational complexity, this problem is usually…
Wind generation is traditionally treated as a non-dispatchable resource and is fully absorbed unless there are security issues. To tackle the operational reliability issues caused by the volatile and non-dispatchable wind generation, many…
In this paper, we study unit commitment (UC) problems considering the uncertainty of load and wind power generation. UC problem is formulated as a chance-constrained two-stage stochastic programming problem where the chance constraint is…