Related papers: Minimum total weighted completion time: Faster app…
In the scheduling with non-uniform communication delay problem, the input is a set of jobs with precedence constraints. Associated with every precedence constraint between a pair of jobs is a communication delay, the time duration the…
This paper considers the problem of scheduling jobs on single and parallel machines where all the jobs possess different processing times but a common due date. There is a penalty involved with each job if it is processed earlier or later…
We study the problem of preemptive scheduling n jobs with given release times on m identical parallel machines. The objective is to minimize the average flow time. We show that when all jobs have equal processing times then the problem can…
We address single machine problems with optional jobs - rejection, studied recently in Zhang et al. [21] and Cao et al. [2]. In these papers, the authors focus on minimizing regular performance measures, i.e., functions that are…
We investigate a single machine rescheduling problem that arises from an unexpected machine unavailability, after the given set of jobs has already been scheduled to minimize the total weighted completion time. Such a disruption is…
There is a long history of approximation schemes for the problem of scheduling jobs on identical machines to minimize the makespan. Such a scheme grants a $(1+\epsilon)$-approximation solution for every $\epsilon > 0$, but the running time…
We revisit two well-studied scheduling problems in the unrelated machines setting where each job can have a different processing time on each machine. For minimizing total weighted completion time we give a 1.45-approximation, which…
We show the existence of a fully polynomial-time approximation scheme (FPTAS) for the problem of maximizing a non-negative polynomial over mixed-integer sets in convex polytopes, when the number of variables is fixed. Moreover, using a…
Time-dependent scheduling with linear deterioration involves determining when to execute jobs whose processing times degrade as their beginning is delayed. Each job i is associated with a release time r_i and a processing time function…
The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…
Coflow is a network abstraction used to represent communication patterns in data centers. The coflow scheduling problem encountered in large data centers is a challenging $\mathcal{NP}$-hard problem. This paper tackles the scheduling…
We propose a Fully Polynomial-Time Approximation Scheme (FPTAS) for stochastic dynamic programs with multidimensional action, scalar state, convex costs and linear state transition function. The action spaces are polyhedral and described by…
We study clustering problems such as k-Median, k-Means, and Facility Location in graphs of low highway dimension, which is a graph parameter modeling transportation networks. It was previously shown that approximation schemes for these…
This paper addresses the problem of scheduling a set of jobs that are released over the time on a set of identical parallel machines, aiming at the minimization of the total weighted completion time. This problem, referred to as $P|r_j|\sum…
The Replenishment Storage problem (RSP) is to minimize the storage capacity requirement for a deterministic demand, multi-item inventory system where each item has a given reorder size and cycle length. The reorders can only take place at…
Pruhs and Woeginger prove the existence of FPTAS's for a general class of minimization and maximization subset selection problems. Without losing generality from the original framework, we prove how better asymptotic worst-case running…
The (Non-Preemptive) Throughput Maximization problem is a natural and fundamental scheduling problem. We are given $n$ jobs, where each job $j$ is characterized by a processing time and a time window, contained in a global interval $[0,T)$,…
We study the general scheduling problem (GSP) which generalizes and unifies several well-studied preemptive single-machine scheduling problems, such as weighted flow time, weighted sum of completion time, and minimizing the total weight of…
We study the Multiple Cluster Scheduling problem and the Multiple Strip Packing problem. For both problems, there is no algorithm with approximation ratio better than $2$ unless $P = NP$. In this paper, we present an algorithm with…