In this paper, we consider an NP-hard problem of scheduling a set of jobs of equal processing time on two machines, given a partial precedence order on the set of jobs, with an objective to minimize the makespan. An approximation algorithm…
We discuss a variant of multitask n-vehicle exploration problem. Instead of requiring an optimal permutation of vehicles in every group, the new problem asks all vehicles in a group to arrive at a same destination. It can also be viewed as…
r-gathering problem is a variant of facility location problems. In this problem, we are given a set of users and a set of facilities on same metric space. We open some of the facilities and assign each user to an open facility, so that at…
This paper mainly focuses on a resource leveling variant of a two-processor scheduling problem. The latter problem is to schedule a set of dependent UET jobs on two identical processors with minimum makespan. It is known to be…
Order picking is the process of retrieving ordered products from storage locations in warehouses. In picker-to-parts order picking systems, two or more customer orders may be grouped and assigned to a single picker. Then routing decision…
We consider the product knapsack problem, which is the variant of the classical 0-1 knapsack problem where the objective consists of maximizing the product of the profits of the selected items. These profits are allowed to be positive or…
Open-pit mine scheduling is a complex real world optimization problem that involves uncertain economic values and dynamically changing resource capacities. Evolutionary algorithms are particularly effective in these scenarios, as they can…
We study the computational complexity of the map redistricting problem (gerrymandering). Mathematically, the electoral district designer (gerrymanderer) attempts to partition a weighted graph into $k$ connected components (districts) such…
In the reordering buffer problem (RBP), a server is asked to process a sequence of requests lying in a metric space. To process a request the server must move to the corresponding point in the metric. The requests can be processed slightly…
Peak/off-peak spreads on European electricity forward and spot markets are eroding due to the ongoing nuclear phaseout in Germany and the steady growth in photovoltaic capacity. The reduced profitability of peak/off-peak arbitrage forces…
We consider the Windows Scheduling problem. The problem is a restricted version of Unit-Fractions Bin Packing, and it is also called Inventory Replenishment in the context of Supply Chain. In brief, the problem is to schedule the use of…
We address a dynamic repair shop scheduling problem in the context of military aircraft fleet management where the goal is to maintain a full complement of aircraft over the long-term. A number of flights, each with a requirement for a…
We have a set of processors (or agents) and a set of graph networks defined over some vertex set. Each processor can access a subset of the graph networks. Each processor has a demand specified as a pair of vertices $<u, v>$, along with a…
We consider a network design problem called the generalized terminal backup problem. Whereas earlier work investigated the edge-connectivity constraints only, we consider both edge- and node-connectivity constraints for this problem. A…
We introduce a natural but seemingly yet unstudied generalization of the problem of scheduling jobs on a single machine so as to minimize the number of tardy jobs. Our generalization lies in simultaneously considering several instances of…
In the scheduling with non-uniform communication delay problem, the input is a set of jobs with precedence constraints. Associated with every precedence constraint between a pair of jobs is a communication delay, the time duration the…
In this work, we explore the use of operator splitting algorithms for solving regularized structural topology optimization problems. The context is the classical structural design problems (e.g., compliance minimization and compliant…
In this paper we consider the open shop scheduling problem where the jobs have delivery times. The minimization criterion is the maximum lateness of the jobs. This problem is known to be NP-hard, even restricted to only 2 machines. We…
In this paper we investigate the problem of simultaneously allocating orders and mobile storage racks to static pickers. Here storage racks are allocated to pickers to enable them to pick all of the products for the orders that have been…
Research on container loading problems has been proved effective in increasing the filling rate of containers in different practical situations. However, the broader logistic context might pressure the loading process, leading to…