Related papers: Minimizing Flow-Time on Unrelated Machines
We consider energy-efficient scheduling on multiprocessors, where the speed of each processor can be individually scaled, and a processor consumes power $s^{\alpha}$ when running at speed $s$, for $\alpha>1$. A scheduling algorithm needs to…
This paper studies a scheduling problem in a parallel machine setting, where each machine must adhere to a predetermined fixed order for processing the jobs. Given $n$ jobs, each with processing times and deadlines, we aim to minimize the…
We consider fundamental scheduling problems motivated by energy issues. In this framework, we are given a set of jobs, each with a release time, deadline and required processing length. The jobs need to be scheduled on a machine so that at…
We give an $O(n^{1.5}\log n)$ time algorithm for finding the maximum flow in a directed planar graph with multiple sources and a single sink. The techniques generalize to a subquadratic time algorithm for bounded genus graphs.
In this paper, we consider the online problem of scheduling independent jobs \emph{non-preemptively} so as to minimize the weighted flow-time on a set of unrelated machines. There has been a considerable amount of work on this problem in…
The problem of scheduling jobs and choosing their respective speeds with multiple servers under a sum power constraint to minimize the flow time + energy is considered. This problem is a generalization of the flow time minimization problem…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
In 2013, Orlin proved that the max flow problem could be solved in $O(nm)$ time. His algorithm ran in $O(nm + m^{1.94})$ time, which was the fastest for graphs with fewer than $n^{1.06}$ arcs. If the graph was not sufficiently sparse, the…
Due to its optimality on a single machine for the problem of minimizing average flow time, Shortest-Remaining-Processing-Time (\srpt) appears to be the most natural algorithm to consider for the problem of minimizing average flow time on…
This paper establishes performance guarantees for online algorithms that schedule stochastic, nonpreemptive jobs on unrelated machines to minimize the expected total weighted completion time. Prior work on unrelated machine scheduling with…
In this paper we show an O(n^(3/2) log^2 n) time algorithm for finding a maximum flow in a planar graph with multiple sources and multiple sinks. This is the fastest algorithm whose running time depends only on the number of vertices in the…
In this work we revisit the elementary scheduling problem $1||\sum p_j U_j$. The goal is to select, among $n$ jobs with processing times and due dates, a subset of jobs with maximum total processing time that can be scheduled in sequence…
In the unsplittable flow problem on a path, we are given a capacitated path $P$ and $n$ tasks, each task having a demand, a profit, and start and end vertices. The goal is to compute a maximum profit set of tasks, such that for each edge…
When parallelizing a set of jobs across many servers, one must balance a trade-off between granting priority to short jobs and maintaining the overall efficiency of the system. When the goal is to minimize the mean flow time of a set of…
The paper considers scheduling on parallel machines under the constraint that some pairs of jobs cannot be processed concurrently. Each job has an associated weight, and all jobs have the same deadline. The objective is to maximise the…
When planning transportation whose operation requires non-consumable resources, the peak demand for allocated resources is often of higher interest than the duration of resource usage. For instance, it is more cost-effective to deliver…
We study flow shop scheduling with stochastic reentry, where jobs must complete multiple passes through the entire shop, and the number of passes that a job requires for completion is drawn from a discrete probability distribution. The goal…
We present a new strongly polynomial algorithm for generalized flow maximization that is significantly simpler and faster than the previous strongly polynomial algorithm [V\'egh16]. For the uncapacitated problem formulation, the complexity…
We study the approximability of two related machine scheduling problems. In the late work minimization problem, there are identical parallel machines and the jobs have a common due date. The objective is to minimize the late work, defined…
Interval scheduling is a basic problem in the theory of algorithms and a classical task in combinatorial optimization. We develop a set of techniques for partitioning and grouping jobs based on their starting and ending times, that enable…