Related papers: Worst-Case Performance Analysis of Some Approximat…
We consider a basic problem of preemptive scheduling of $n$ non-simultaneously released jobs on a group of $m$ unrelated parallel machines so as to minimize maximum job completion time, the makespan. In the scheduling literature, the…
Makespan minimization on identical machines is a fundamental problem in online scheduling. The goal is to assign a sequence of jobs to $m$ identical parallel machines so as to minimize the maximum completion time of any job. Already in the…
We consider a natural generalization of scheduling $n$ jobs on $m$ parallel machines so as to minimize the makespan. In our extension the set of jobs is partitioned into several classes and a machine requires a setup whenever it switches…
In a classical scheduling problem, we are given a set of $n$ jobs of unit length along with precedence constraints, and the goal is to find a schedule of these jobs on $m$ identical machines that minimizes the makespan. Using the standard…
This paper addresses the challenging scheduling problem of coflows with release times, with the objective of minimizing the total weighted completion time. Previous literature has predominantly concentrated on establishing the scheduling…
We consider Johnson's rule for minimizing the makespan in the two-machine flow shop problem. Although its worst-case time complexity is O(n log n), we show that it is possible to detect in linear time whether a full sorting of jobs can be…
Scheduling packets with end-to-end deadline constraints in multihop networks is an important problem that has been notoriously difficult to tackle. Recently, there has been progress on this problem in the worst-case traffic setting, with…
In this paper we analyze the worst-case performance of a greedy algorithm called Largest-Z-ratio-First for the problem of scheduling unreliable jobs on m parallel machines. Each job is characterized by a success probability and a reward…
We study the classical scheduling problem on parallel machines %with precedence constraints where the precedence graph has the bounded depth $h$. Our goal is to minimize the maximum completion time. We focus on developing approximation…
This paper studies a scheduling problem in a parallel machine setting, where each machine must adhere to a predetermined fixed order for processing the jobs. Given $n$ jobs, each with processing times and deadlines, we aim to minimize the…
We consider the classical minimum makespan scheduling problem, where the processing time of job $j$ on machine $i$ is $p_{ij}$, and the matrix $P=(p_{ij})_{m\times n}$ is of a low rank. It is proved in (Bhaskara et al., SODA 2013) that rank…
In this paper we consider the open shop scheduling problem where the jobs have delivery times. The minimization criterion is the maximum lateness of the jobs. This problem is known to be NP-hard, even restricted to only 2 machines. We…
We introduce a parallel machine scheduling problem in which the processing times of jobs are not given in advance but are determined by a system of linear constraints. The objective is to minimize the makespan, i.e., the maximum job…
We study stochastic combinatorial optimization problems where the objective is to minimize the expected maximum load (a.k.a.\ the makespan). In this framework, we have a set of $n$ tasks and $m$ resources, where each task $j$ uses some…
We consider some flow-time minimization problems in the unrelated machines setting. In this setting, there is a set of $m$ machines and a set of $n$ jobs, and each job $j$ has a machine dependent processing time of $p_{ij}$ on machine $i$.…
Two common objectives for evaluating a schedule are the makespan, or schedule length, and the average completion time. This short note gives improved bounds on the existence of schedules that simultaneously optimize both criteria. In…
Time-dependent scheduling with linear deterioration involves determining when to execute jobs whose processing times degrade as their beginning is delayed. Each job i is associated with a release time r_i and a processing time function…
We consider the online resource minimization problem in which jobs with hard deadlines arrive online over time at their release dates. The task is to determine a feasible schedule on a minimum number of machines. We rigorously study this…
We study the problem of preemptive scheduling of n equal-length jobs with given release times on m identical parallel machines. The objective is to minimize the average flow time. Recently, Brucker and Kravchenko proved that the optimal…
This paper considers the online machine minimization problem, a basic real time scheduling problem. The setting for this problem consists of n jobs that arrive over time, where each job has a deadline by which it must be completed. The goal…