Related papers: Iterated Variable Neighborhood Search for the reso…
We study stochastic combinatorial optimization problems where the objective is to minimize the expected maximum load (a.k.a.\ the makespan). In this framework, we have a set of $n$ tasks and $m$ resources, where each task $j$ uses some…
Sequential decision problems in applications such as manipulation in warehouses, multi-step meal preparation, and routing in autonomous vehicle networks often involve reasoning about uncertainty, planning over discrete modes as well as…
The Multiple Depot Ring-Star Problem (MDRSP) is an important combinatorial optimization problem that arises in the context of optical fiber network design, and in applications pertaining to collecting data using stationary sensing devices…
Optimal decision-making presents a significant challenge for autonomous systems operating in uncertain, stochastic and time-varying environments. Environmental variability over time can significantly impact the system's optimal decision…
Markov decision process (MDP) is a decision making framework where a decision maker is interested in maximizing the expected discounted value of a stream of rewards received at future stages at various states which are visited according to…
Multi-mode resource-constrained project scheduling problems (MRCPSPs) are classified as NP-hard problems, in which a task has different execution modes characterized by different resource requirements. Estimation of distribution algorithm…
Robust Markov decision processes (RMDPs) extend standard Markov decision processes (MDPs) to account for uncertainty in the transition probabilities. RMDPs have an uncertainty set that defines a set of possible transition functions, each of…
We consider the uncertain multi-robot motion planning (MRMP) problem with cooperative localization (CL-MRMP), under both motion and measurement noise, where each robot can act as a sensor for its nearby teammates. We formalize CL-MRMP as a…
Today scheduling problems have an immense effect on various areas of human lives, be it from their application in manufacturing and production industry, transportation, or workforce allocation. The unrelated parallel machines scheduling…
We introduce a parallel machine scheduling problem in which the processing times of jobs are not given in advance but are determined by a system of linear constraints. The objective is to minimize the makespan, i.e., the maximum job…
We are concerned with three types of uncertainties: probabilistic, possibilitistic and interval. By using possibility and necessity measures as an Interval Valued Probability Measure (IVPM), we present IVPM's interval expected values whose…
Safety and robustness are two desired properties for any reinforcement learning algorithm. CMDPs can handle additional safety constraints and RMDPs can perform well under model uncertainties. In this paper, we propose to unite these two…
We study capacity- and budget-constrained multi-agent MDPs (CB-MA-MDPs), a class that captures many maintenance and scheduling tasks in which each agent can irreversibly fail and a planner must decide (i) when to apply a restorative action…
We explore a multiple-stage variant of the min-max robust selection problem with budgeted uncertainty that includes queries. First, one queries a subset of items and gets the exact values of their uncertain parameters. Given this…
This paper presents a simulation approach to enhance the performance of heuristics for multi-project scheduling. Unlike other heuristics available in the literature that use only one priority criterion for resource allocation, this paper…
Many complex activities of production cycles, such as quality control or fault analysis, require highly experienced specialists to perform various operations on (semi)finished products using different tools. In practical scenarios, the…
This paper presents a framework to tackle constrained combinatorial optimization problems using deep Reinforcement Learning (RL). To this end, we extend the Neural Combinatorial Optimization (NCO) theory in order to deal with constraints in…
We consider a project that consists of activities to be performed in parallel under various temporal constraints, which include start-start, start-finish and finish-start precedence relationships, release times, deadlines, and due dates.…
In this paper, we develop a new formulation of changeover constraints for mixed integer programming problem (MIP) that emerges in solving a short-term production scheduling problem. The new model requires fewer constraints than the original…
In this paper, we investigate the Resource-Constrained Project Scheduling Problem (RCPSP) with time-of-use energy tariffs (TOU) and machine states, a variant of RCPSP for production scheduling where energy price is part of the criteria and…