Related papers: On the optimality of approximation schemes for the…
We study the Parallel Task Scheduling problem $Pm|size_j|C_{\max}$ with a constant number of machines. This problem is known to be strongly NP-complete for each $m \geq 5$, while it is solvable in pseudo-polynomial time for each $m \leq 3$.…
Motivated by green manufacturing, this paper investigates a scheduling with rejection problem subject to an energy consumption constraint. Machines are associated with non-uniform energy consumption rates, defined as the energy consumed per…
Scheduling jobs with given processing times on identical parallel machines so as to minimize their total completion time is one of the most basic scheduling problems. We study interesting generalizations of this classical problem involving…
A central problem in scheduling is to schedule $n$ unit size jobs with precedence constraints on $m$ identical machines so as to minimize the makespan. For $m=3$, it is not even known if the problem is NP-hard and this is one of the last…
This paper considers the problem of scheduling jobs on single and parallel machines where all the jobs possess different processing times but a common due date. There is a penalty involved with each job if it is processed earlier or later…
The Makespan Scheduling problem is an extensively studied NP-hard problem, and its simplest version looks for an allocation approach for a set of jobs with deterministic processing times to two identical machines such that the makespan is…
Due to its optimality on a single machine for the problem of minimizing average flow time, Shortest-Remaining-Processing-Time (\srpt) appears to be the most natural algorithm to consider for the problem of minimizing average flow time on…
We consider the classic problem of scheduling jobs with precedence constraints on identical machines to minimize makespan, in the presence of communication delays. In this setting, denoted by $\mathsf{P} \mid \mathsf{prec}, c \mid…
Machine scheduling problems involving conflict jobs can be seen as a constrained version of the classical scheduling problem, in which some jobs are conflict in the sense that they cannot be proceeded simultaneously on different machines.…
We consider the $\mathcal{NP}$-hard problem $\mathrm{P} \mathbf{\vert} \mathrm{pmtn, setup=s_i} \mathbf{\vert} \mathrm{C_{\max}}$, the problem of scheduling $n$ jobs, which are divided into $c$ classes, on $m$ identical parallel machines…
The field of exact exponential time algorithms for NP-hard problems has thrived over the last decade. While exhaustive search remains asymptotically the fastest known algorithm for some basic problems, difficult and non-trivial exponential…
We consider the problem of scheduling jobs with equal lengths on uniform parallel batch machines with non-identical capacities where each job can only be processed on a specified subset of machines called its processing set. For the case of…
We consider the problem of scheduling $n$ precedence-constrained jobs on $m$ uniformly-related machines in the presence of an arbitrary, fixed communication delay $\rho$. We consider a model that allows job duplication, i.e. processing of…
Over the past few years, self-attention is shining in the field of deep learning, especially in the domain of natural language processing(NLP). Its impressive effectiveness, along with ubiquitous implementations, have aroused our interest…
Counting the independent sets of a graph is a classical #P-complete problem, even in the bipartite case. We give an exponential-time approximation scheme for this problem which is faster than the best known algorithm for the exact problem.…
Time-dependent scheduling with linear deterioration involves determining when to execute jobs whose processing times degrade as their beginning is delayed. Each job i is associated with a release time r_i and a processing time function…
Motivated by mail delivery scheduling problems arising in Royal Mail, we study a generalization of the fundamental makespan scheduling P||Cmax problem which we call the bounded job start scheduling problem. Given a set of jobs, each…
The classic algorithm [Papadimitriou, J.ACM '81] for IPs has a running time $n^{O(m)}(m\cdot\max\{\Delta,\|\textbf{b}\|_{\infty}\})^{O(m^2)}$, where $m$ is the number of constraints, $n$ is the number of variables, and $\Delta$ and…
In this paper we study the classical problem of throughput maximization. In this problem we have a collection $J$ of $n$ jobs, each having a release time $r_j$, deadline $d_j$, and processing time $p_j$. They have to be scheduled…
Goemans and Rothvoss (SODA'14) gave a framework for solving problems which can be described as finding a point in int$.$cone$(P\cap\mathbb{Z}^N)\cap Q$, where $P,Q\subset\mathbb{R}^N$ are (bounded) polyhedra. The running time for solving…