Related papers: Scheduling unit processing time arc shutdown jobs …
A scheduling method in a robotic network cloud system with minimal makespan is beneficial as the system can complete all the tasks assigned to it in the fastest way. Robotic network cloud systems can be translated into graphs where nodes…
This paper studies the scheduling of jobs of different families on parallel machines with qualification constraints. Originating from semiconductor manufacturing, this constraint imposes a time threshold between the execution of two jobs of…
We introduce and investigate reroutable flows, a robust version of network flows in which link failures can be mitigated by rerouting the affected flow. Given a capacitated network, a path flow is reroutable if after failure of an arbitrary…
Scheduling plays an important role in automated production. Its impact can be found in various fields such as the manufacturing industry, the service industry and the technology industry. A scheduling problem (NP-hard) is a task of finding…
The notion of arc consistency plays a central role in constraint satisfaction. It is known that the notion of local consistency can be extended to constraint optimisation problems defined by soft constraint frameworks based on an idempotent…
A queue is required when a service provider is not able to handle jobs arriving over the time. In a highly flexible and dynamic environment, some jobs might demand for faster execution at run-time especially when the resources are limited…
This paper studies a single-machine scheduling problem with a non-renewable resource (NR-SSP) and total weighted completion time criterion. The non-renewable resource is consumed when the machine starts processing a job. We consider the…
In this paper, we study an NP-hard problem of a single machine scheduling minimizing the makespan, where the mixed-critical tasks with an uncertain processing time are scheduled. We show the derivation of F-shaped tasks from the probability…
An acceptable response time of a server is an important aspect in many client-server applications; this is evident in situations in which the server is overloaded by many computationally intensive requests. In this work, we consider that…
Personnel scheduling problems have received considerable academic attention due to their relevance in various real-world applications. These problems involve preparing feasible schedules for an organization's employees and often account for…
We study shared multi-processor scheduling problem where each job can be executed on its private processor and simultaneously on one of many processors shared by all jobs in order to reduce the job's completion time due to processing time…
We consider the joint scheduling-and-power-allocation problem of a downlink cellular system. The system consists of two groups of users: real-time (RT) and non-real-time (NRT) users. Given some average power constraint on the base station,…
We consider two-machine routing open shop problem on a tree. In this problem a transportation network with a tree-like structure is given, and each node contains some jobs to be processed by two mobile machines. Machines are initially…
We present an aircraft maintenance scheduling problem, which requires suitably qualified staff to be assigned to maintenance tasks on each aircraft. The tasks on each aircraft must be completed within a given turn around window so that the…
In High Performance Computing (HPC) infrastructures, the control of resources by batch systems can lead to prolonged queue waiting times and adverse effects on the overall execution times of applications, particularly in data-intensive and…
The motivation for this work stems from the problem of scheduling requests for flow at supply points along an automated network of open-water channels. The off-take flows are rigid-profile inputs to the system dynamics. In particular, the…
We consider a joint scheduling-and-power-allocation problem of a downlink cellular system. The system consists of two groups of users: real-time (RT) and non-real-time (NRT) users. Given an average power constraint on the base station, the…
Flowshop machine scheduling has been of main interest in several applications where the timing of its processes plays a fundamental role in the utilization of system resources. Addressing the optimal sequencing of the jobs when equivalent…
Networks in which the processing of jobs occurs both sequentially and in parallel are prevalent in many application domains, such as computer systems, healthcare, manufacturing, and project management. The parallel processing of jobs gives…
Natural disasters require repairing all damaged components in electricity distribution networks. Optimal scheduling repair crews to minimize the aggregate duration of interruptions reduces the harm. We consider the fact that the number of…