Related papers: Alignment and Aperture Scan at the Fermilab Booste…
The Fermilab Booster - built more than 40 years ago - operates well above the design proton beam intensity of 4x10**12 ppp. Still, the Fermilab neutrino experiments call for even higher intensity of 5.5x10**12 ppp. A multitude of intensity…
The 40-year-old Fermilab Proton Source machines, constituted by the Pre-Injector, Linac and the synchrotron Booster, have been the workhorse of the Fermi National Accelerator Laboratory (Fermilab). During this time, the High Energy Physics…
An overview is given of the methods and preliminary results from dedicated beam studies on three topics conducted over five days in July 2023. In the first study, the Fermilab Booster magnets were held constant at magnetic fields…
PIP-II is the Fermilab's flagship project for providing powerful, high-intensity proton beams to the laboratory's experiments. The heart of PIP-II is an 800-MeV superconducting linac accelerator. It will be located in a new tunnel with new…
Active discussion on the high energy physics priorities in the US carried out since summer of 2013 resulted in changes in Fermilab plans for future development of the existing accelerator complex. In particular, the scope of Project X was…
We have measured the total energy spread (99 persent energy spread) of the Booster beam at its injection energy of 400 MeV by three different methods - 1) creating a notch of about 40 nsec wide in the beam immediately after multiple turn…
The Proton Improvement Plan, Stage Two (PIP-II) is a program of upgrades proposed for the Fermilab injection complex, which central part is an 800 MeV, 2 mA CW SRF linac. A prototype of the PIP-II linac front end called PIP-II Injector Test…
The Fermilab Proton Improvement Plan (PIP) was formed in late 2011 to address important and necessary upgrades to the Proton Source machines (Injector line, Linac and Booster). The goal is to increase the proton flux by doubling the Booster…
The Proton Improvement Plan-II (PIP-II) [1] has been developed at Fermilab to provide powerful proton beams to the laboratorys experiments. An 800-MeV superconducting linear accelerator-a centerpiece of the project-is currently under…
The SPIN@FERMI collaboration has updated its 1991-95 Reports on the acceleration of polarized protons in Fermilab's Main Injector, which was commissioned by Fermilab. This Updated Report summarizes some updated Physics Goals for a 120-150…
We have developed a computer program interfaced with the ACNET environment of Fermilab accelerators to measure energy spread of the proton beam from the LINAC at an injection into the Booster. It uses a digitizing oscilloscope and provides…
The Fermilab Booster uses multi-turn beam injection with all its cavities phased such that beam sees a net zero RF voltage even when each station is at the same maxi-mum voltage. During beam capture the RF voltage is increased slowly by…
Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In…
Fermilab Booster synchrotron requires an intensity upgrade from 4.5x1012 to 6.5x1012 protons per pulse as a part of Fermilabs Proton Improvement Plan-II (PIP-II). One of the factors which may limit the high-intensity performance is the fast…
Detrimental beam dynamics effects limit performance of high intensity rapid cycling synchrotrons (RCS) such as the 8 GeV proton Fermilab Booster. Here we report the results of comprehensive experimental studies of various beam intensity…
The current program at Fermilab involves the construction of a new superconducting linear accelerator (LINAC) to replace the existing warm version. The new LINAC, together with other planned improvements, is in support of proton beam…
The upcoming Proton Improvement Plan-II (PIP-II), designated for enhancements to the Fermilab accelerator complex, features a new 800 MeV superconducting linac and a Beam Transfer Line (BTL) to transport the beam to the existing Booster…
The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab's particle accelerator complex to enable the world's most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come.…
The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac…
The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging and often depends on non-invasive techniques. One such…