Related papers: Emittance and Phase Space Tomography for the Fermi…
Suppression of beam losses is essential for successful operation of high-intensity linac. Historically, the values of the field amplitudes and phases of the side-coupled, 805-MHz LANSCE linac modules are maintained using a well-known…
For injection of beams into circular machines with different horizontal and vertical emittance acceptance, the injection efficiency can be increased if these beams are flat, i.e. if they feature unequal transverse emittances. Generation of…
The upcoming Proton Improvement Plan-II (PIP-II), designated for enhancements to the Fermilab accelerator complex, features a new 800 MeV superconducting linac and a Beam Transfer Line (BTL) to transport the beam to the existing Booster…
The closed-off structure of the Fermilab Drift Tube Linac precludes a robust array of instrumentation from directly monitoring the H- beam that is accelerated from 750 keV to 116 MeV. To improve beam tuning and operational assessment of…
The measurement of beam emittances by extracting the quadrupole mode signal from a 4 plate beam position monitor (BPM) was published at least 40 years ago. Unfortunately, in practice, this method suffers from poor signal to noise ratio and…
PIP-II is an essential upgrade of the Fermilab complex that will enable the worlds most intense high-energy beam of neutrinos for the international Deep Underground Neutrino Experiment at LBNF and support a broad physics program at…
In superconducting linear accelerators (linacs), accurately monitoring beam dynamics is essential for minimizing beam losses and ensuring stable operations. However, destructive diagnostics must be avoided in superconducting sections to…
We compare three techniques for characterising the transverse phase space distribution of the beam in CLARA FE (the Compact Linear Accelerator for Research and Applications Front End, at Daresbury Laboratory, UK): emittance and optics…
A series of beam dynamic studies were performed in 2020-2021 at the PIP-II Injector Test Facility (PIP2IT) that has been built to validate the concept of the front-end of the PIP-II linac being constructed at Fermilab. PIP2IT is comprised…
The Low-Energy Demonstration Accelerator (LEDA) radio-frequency quadrupole (RFQ) is a 100% duty factor (CW) linac that delivers >100 mA of H+ beam at 6.7 MeV. The 8-m-long, 350-MHz RFQ structure accelerates a dc, 75-keV, 110-mA H+ beam from…
The Fermi National Accelerator Laboratory (Fermilab) Linac accepts 750 keV H- ions from the front end and accelerates them to 400 MeV for injection into the Booster rapid cycling synchrotron. Day-to-day drifts in the beam longitudinal…
High power, relativistic electron beams from energy recovery linacs have great potential to realize new experimental paradigms for pioneering innovation in fundamental and applied research. A major design consideration for this new…
In order to investigate and understand the influence of gun design, cathode preparation and operational parameters on the beam quality it is important to have reliable and accurate beam diagnostics available. The focus of this work was thus…
Following the PIP-II 800 MeV Linac, Fermilab will need an accelerator that extends from that linac to the MI injection energy of ~8 GeV, completing the modernization of the Fermilab high-intensity accelerator complex. This will maximize the…
The energy of a bunched non-relativistic ion beam can be deduced from measuring the beam phases in neighbouring Beam Position Monitors (BPMs). This report discusses implementation of such a procedure at the PIP-II H- linac being constructed…
The paper proposes a method of finding the beam loss locations in a linac. If the beam is scraped at an aperture limitation, moving its centroid with two dipole correctors located upstream and oscillating in sync produces a line at the…
Matching to small beta functions is required to preserve emittance in plasma accelerators. The plasma wake provides strong focusing fields, which typically require beta functions on the mm-scale, comparable to those found in the final…
An experimental program to demonstrate a novel phase space manipulation in which the horizontal and longitudinal emittances of a particle beam are exchanged has been completed at the Fermilab A0 Photoinjector. A new beamline, consisting of…
The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling…
The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging and often depends on non-invasive techniques. One such…