Related papers: A Two-stage injection-locked magnetron for acceler…
Two qubit gates constitute fundamental building blocks in the realization of large-scale quantum devices. Using superconducting circuits, two-qubit gates have previously been implemented in different ways with each method aiming to maximize…
Project-X is the proposed high intensity proton facility to be built at Fermilab, US. Its Superconducting Linac, to be used at first stage of acceleration, will be operated in continuous wave (CW) mode. The Linac is divided into three…
Fermilab is upgrading its Booster synchrotron to increase ramp rate and intensity. This is part of the Proton Improvement Plan (PIP-II) that will allow the Main Injector to achieve proton beam power of 1.2 MW within the next few years. This…
We summarize the current state of a concept for muon acceleration aimed at a future Neutrino Factory. The main thrust of these studies was to reduce the overall cost while maintaining performance by exploring the interplay between the…
This paper presents an 8 GeV Rapid Cycling Synchrotron (RCS) option for Project X. It has several advantages over an 8 GeV SC linac. In particular, the cost could be lower. With a 2 GeV 10 mA pulsed linac as injector, the RCS would be able…
Project-X is the proposed high intensity proton facility to be built at Fermilab, US. First stage of the Project-X consists of superconducting linac which will be operated in continuous wave (CW) mode to accelerate the beam from 2.5 MeV to…
A high-efficiency power-combining method for four-way 5.8-GHz magnetrons based on the external injection-locking technique is presented in this article. The method uses a nonisolated, lossless five-port hybrid waveguide combiner for power…
A novel injection-locked S-band microwave oven magnetron system is proposed, analyzed, and experimented. The magnetron is considered as a two-port oscillator, and the filament structures of it are used as a port for injection locking. To…
Project-X is a leading candidate of the next major accelerator construction project at Fermilab. The mission need of Project-X is to establish an intensity frontier for particle physics research, or more precisely, to build a multi-MW…
A superconducting (SC) linac is expected to lead to outstanding discoveries in various scientific fields because its beam current is a few orders of magnitude larger than in a normal-conducting linac. However, the widespread use of SC linac…
The next generation of high-energy physics experiments requires high intensity protons in the multi-GeV energy range for efficient production of secondary beams. The Fermilab long-term future requires an 8 GeV proton source to feed the Main…
Four decades ago development of high-current superconducting NbTi wire cables revolutionized the magnet technology for energy frontier accelerators, such as Tevatron, RHIC and LHC. The NbTi based magnets offered advantage of much higher…
This paper describes the construction and operational status of an accelerator test facility for Project X. The purpose of this facility is for Project X component development activities that benefit from beam tests and any development…
Superconducting linacs are capable of producing intense, stable, high-quality electron beams that have found widespread applications in science and industry. The 9-cell 1.3-GHz superconducting standing-wave accelerating RF cavity originally…
A simplified analytical model of the resonant interaction of the beam of Larmor electrons drifting in the crossed constant fields of a magnetron with a synchronous wave providing a phase grouping of the drifting charge was developed to…
The JAERI/KEK Joint Project for the high-intensity proton accelerator facility has been proposed with a superconducting (SC) linac option from 400 MeV to 600MeV. System design of the SC linac has been carried out based on the…
Project-X is a proposed project to be built at Fermi National Accelerator Laboratory with several potential missions. A primary part of the Project-X accelerator chain is a Superconducting linac, and In October 2009 a workshop was held to…
Phase and power control methods that satisfy the requirements of superconducting accelerators to magnetron RF sources were considered by a simplified kinetic model of a magnetron driven by a resonant injected signal. The model predicting…
In order to update the beam power from 100 kW to 250 kW in China spallation neutron source (CSNS) Phase II, one of the important measures is to replace the 80 meters long beam transport line between the present 80 MeV linac injector and the…
The construction of the initial part of a normally conducting linac for hydrogen ion beams with a pulsed current of ~20 mA up to an energy of ~70 MeV is considered. The RFQ at a frequency of ~160 MHz accelerates ions to an energy of ~4 MeV.…