Related papers: The 2-valued case of makespan minimization with as…
Given $n$ jobs with processing times $p_1,\dotsc,p_n\in\mathbb N$ and $m\le n$ machines with speeds $s_1,\dotsc,s_m\in\mathbb N$ our goal is to allocate the jobs to machines minimizing the makespan. We present an algorithm that solves the…
Given a system model where machines have distinct speeds and power ratings but are otherwise compatible, we consider various problems of scheduling under resource constraints on the system which place the restriction that not all machines…
Motivated by mail delivery scheduling problems arising in Royal Mail, we study a generalization of the fundamental makespan scheduling P||Cmax problem which we call the bounded job start scheduling problem. Given a set of jobs, each…
We consider the classical minimum makespan scheduling problem, where the processing time of job $j$ on machine $i$ is $p_{ij}$, and the matrix $P=(p_{ij})_{m\times n}$ is of a low rank. It is proved in (Bhaskara et al., SODA 2013) that rank…
The paper considers scheduling on parallel machines under the constraint that some pairs of jobs cannot be processed concurrently. Each job has an associated weight, and all jobs have the same deadline. The objective is to maximise the…
We consider job scheduling settings, with multiple machines, where jobs arrive online and choose a machine selfishly so as to minimize their cost. Our objective is the classic makespan minimization objective, which corresponds to the…
A very well-known machine model in scheduling allows the machines to be unrelated, modelling jobs that might have different characteristics on each machine. Due to its generality, many optimization problems of this form are very difficult…
We consider the two-parallel machines scheduling problem, with the aim of minimizing the maximum lateness and the makespan. Formally, the problem is defined as follows. We have to schedule a set J of n jobs on two identical machines. Each…
This paper mainly focuses on a resource leveling variant of a two-processor scheduling problem. The latter problem is to schedule a set of dependent UET jobs on two identical processors with minimum makespan. It is known to be…
We study the problem of preemptive scheduling of n equal-length jobs with given release times on m identical parallel machines. The objective is to minimize the average flow time. Recently, Brucker and Kravchenko proved that the optimal…
We consider some flow-time minimization problems in the unrelated machines setting. In this setting, there is a set of $m$ machines and a set of $n$ jobs, and each job $j$ has a machine dependent processing time of $p_{ij}$ on machine $i$.…
This paper studies the bicriteria problem of scheduling $n$ jobs on a serial-batch machine to minimize makespan and maximum cost simultaneously. A serial-batch machine can process up to $b$ jobs as a batch, where $b$ is known as the batch…
We study problems of scheduling jobs on related machines so as to minimize the makespan in the setting where machines are strategic agents. In this problem, each job $j$ has a length $l_{j}$ and each machine $i$ has a private speed $t_{i}$.…
This paper considers the problem of scheduling jobs on single and parallel machines where all the jobs possess different processing times but a common due date. There is a penalty involved with each job if it is processed earlier or later…
We consider a variant of the NP-hard problem of assigning jobs to machines to minimize the completion time of the last job. Usually, precedence constraints are given by a partial order on the set of jobs, and each job requires all its…
This paper studies the scheduling of jobs of different families on parallel machines with qualification constraints. Originating from semiconductor manufacturing, this constraint imposes a time threshold between the execution of two jobs of…
We study the classic problem of minimizing the expected total completion time of jobs on $m$ identical machines in the setting where the sizes of the jobs are stochastic. Specifically, the size of each job is a random variable whose…
In the classical problem of scheduling on unrelated parallel machines, a set of jobs has to be assigned to a set of machines. The jobs have a processing time depending on the machine and the goal is to minimize the makespan, that is the…
Recently, the problem of multitasking scheduling has attracted a lot of attention in the service industries where workers frequently perform multiple tasks by switching from one task to another. Hall, Leung and Li (Discrete Applied…
We study the restricted case of Scheduling on Unrelated Parallel Machines. In this problem, we are given a set of jobs $J$ with processing times $p_j$ and each job may be scheduled only on some subset of machines $S_j \subseteq M$. The goal…