Related papers: Status and plans for a SRF accelerator test facili…
High precision Low-level RF (LLRF) control and monitoring systems for future particle accelerators will be a significant technical challenge as the requirements in performance, flexibility and affordability become increasingly stringent. We…
The PIP-II superconducting RF linac is currently under construction at Fermilab and is expected to be completed by the end of 2028. PIP-II is capable of operating in a continuous-wave mode and can concurrently supply 800 MeV protons to a…
High-power electron beams are sought-after tools in support to a wide array of societal applications. This paper investigates the production of high-power electron beams by combining a high-current field-emission electron source to a…
The Fermilab Proton Improvement Plan II, or PIP-II, would enable the world's most intense high-energy neutrino beam and would help scientists search for rare particle physics processes. The PIP-II goal is to deliver 1.2 MW of proton beam…
The Fermilab Linac is a roughly 145 meter linear accelerator that accelerates H- beam from 750 keV to 400 MeV and provides beam for the Booster and the rest of the accelerator chain. The first section of the Linac is a Drift-Tube Linac…
High-power particle production targets are crucial elements of future neutrino and other rare particle beams. Fermilab plans to produce a beam of neutrinos (LBNE) with a 2.3 MW proton beam (Project X). Any solid target is unlikely to…
Increasing proton beam power on neutrino production targets is one of the major goals of the Fermilab long term accelerator programs. In this effort, the Fermilab 8 GeV Booster synchrotron plays a critical role for at least the next two…
In a partnership with SLAC National Accelerator Laboratory (SLAC) and Jefferson Lab, Fermilab will assemble and test 17 of the 35 total 1.3 GHz cryomodules for the Linac Coherent Light Source II (LCLS-II) Project. These include a prototype…
The next generation of lepton flavor violation experiments need high intensity and high quality muon beams. Production of such beams requires sending a short, high intensity proton pulse to the pion production target, capturing pions and…
The intense neutron source for development of fusion materials planned by international collaboration makes a new step to clarify the technical issues for realizing the 40 MeV, 250 mA deuteron beam facility. The baseline concept employs two…
The U.S. Particle Physics Project Prioritization Panel (P5) report encouraged the realization of Fermilab's Proton Improvement Plan II (PIP-II) to support future neutrino programs in the United States. PIP-II aims at enhancing the…
The FLASH L-band (1.3 GHz) superconducting accelerator facility at DESY has a Low Level RF (LLRF) system that is similar to that envisioned for ILC. This system has extensive monitoring capability and was used to gather performance data…
Fermilab has developed a novel concept for an industrial electron linac using Nb3Sn coating technology and conduction cooling. These conduction-cooled linacs can generate electron beam energies up to 10 MeV in continuous-wave operation and…
We report on the development of a radio frequency (RF) linear accelerator (linac) for multiple-ion beams that is made from stacks of low cost wafers. The accelerator lattice is comprised of RF-acceleration gaps and electrostatic quadrupole…
In the context of the evaluation of possibly using the Fermilab Electron Cooler for the proposed low-energy RHIC run at BNL, operating the cooler at 1.6 MeV electron beam energy was tested in a short beam line configuration. The main…
A new high field spectrometer has been built to extend the capabilities of the $\beta$-detected nuclear magnetic resonance ($\beta$-NMR) facility at TRIUMF. This new beamline extension allows $\beta$-NMR spectroscopy to be performed with…
Superconducting radio-frequency (SRF) accelerating cavities are a promising technology for compact, high-power, MeV-scale accelerators, providing continuous beam operation for a wide range of potential applications in industry, medicine,…
The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour, which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is…
In this article, we share our experience related to the new photo-injector commissioning at the SPARC\_LAB test facility. The new photo-injector was installed into an existing machine and our goal was not only to improve the final beam…
The ICARUS liquid argon TPC detector is taking data on the Booster (BNB) and Main Injector (NuMI) Neutrino beam lines at Fermilab with a trigger system based on the scintillation light produced by charged particles in coincidence with the…