Related papers: A vector control and data acquisition system for t…
The commissioning of two cryomodule components is underway at Fermilab's Superconducting Radio Frequency (SRF) Accelerator Test Facility. The research at this facility supports the next generation high intensity linear accelerators such as…
The FLASH L-band (1.3 GHz) superconducting accelerator facility at DESY has a Low Level RF (LLRF) system that is similar to that envisioned for ILC. This system has extensive monitoring capability and was used to gather performance data…
PIP-II is a superconducting linac that is in the initial acceleration chain for the Fermilab accelerator complex. The RF system consists of a warm front-end with an RFQ and buncher cavities along with 25 superconducting cryo-modules…
The LLRF of five of TRIUMF's ISAC-1 accelerator cavities have been replaced by 3 similar FPGA based system with different operating frequencies. These LLRF use internal digital phase locked loops for frequency generation and…
The FLASH L-band (1.3 GHz) superconducting accelerator facility at DESY has a Low Level RF (LLRF) system that is similar to that envisioned for ILC. This system has extensive monitoring capability and was used to gather performance data…
We describe a many-channel experiment control system based on a field-programmable gate array (FPGA). The system has 16 bit resolution on 10 analog 100 MS/s input channels, 14 analog 100 MS/s output channels, 16 slow analog input and output…
The first generation Low-Level radio frequency(LLRF) control system independently developed by IMPCAS, the operating frequency is 162.5MHz for China ADS, which consists of superconducting cavity amplitude stability control, phase stability…
An interlock system has been designed for the Fermilab Cryo-module Test Stand (CMTS), a test bed for the cryomodules to be used in the upcoming Linac Coherent Light Source 2 (LCLS-II) project at SLAC. The interlock system features 8…
Waveform feature is one of the requirements for the FRIB LLRF controllers. It is desired that the LLRF con-trollers store the internal data (e.g. the amplitude and phase information of forward/reverse/cavity signals) for at least one second…
A remote data acquisition chassis, called a HOTLink Rack Monitor, HRM, has been developed for use in the Fermilab control system. This chassis provides for 64 analog input channels, 8 analog output channels, and 8 bytes of digital I/O. The…
CEA IRFU Saclay is taking part of ESS (European Spallation Source) construction through several packages and, especially in the last three years on the Elliptical Cavity and Cryomodule Test stand Demonstrator (ECCTD). The project consists…
The LCLS-II HE superconducting linac can produce multi-energy beams by supporting multiple undulator lines simultaneously. This could be achieved by using the cavity SRF tuner in the off-frequency detune mode. This off-frequency operation…
The goal of a LLRF system is to control an actual RF cavity with beam. While digital simulations have a place, having an analog circuit to stand in for the cavity can be tremendously helpful in validating hardware+firmware+software under…
Fermilab recently completed production and testing of 1.3 GHz cryomodules for the LCLS-II project. Each cryomodule consists of eight TESLA-shaped superconducting elliptical cavities equipped with two High Order Mode (HOM) coupler ports.…
PIP-II is an 800 MEV superconducting linac that is in the initial acceleration chain for the Fermilab accelerator complex. The RF system consists of a warm front-end with an ion source, RFQ and buncher cavities along with 25 superconducting…
The low level rf (LLRF) control system for the rapid cycling synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC) started its operation in 2007. The key functions of the LLRF control system are the dual harmonic auto…
The LIGO Control and Data system (CDS) features a tightly coupled and highly integrated control and data acquisition system. Control of the interferometers requires many Multiple Input Multiple Output (MIMO) control loops closed both…
A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, and…
We describe a modular multi-channel data acquisition system based on the 5-15 Gigasample-per-second waveform-recording PSEC4 chip. The system architecture incorporates two levels of hardware with FPGA-embedded system control and in-line…
The technique presented in this paper enables the regulation of both radio frequency amplitude and phase in narrow band devices such as a Superconducting RF (SRF) cavity driven by constant power output devices i.e. magnetrons. The ability…