Related papers: Project X functional requirements specification
Project-X is a leading candidate of the next major accelerator construction project at Fermilab. The mission need of Project-X is to establish an intensity frontier for particle physics research, or more precisely, to build a multi-MW…
The Project X Injector Experiment (PXIE) will serve as a prototype for the Project X front end. The aim is to validate the Project-X design and to decrease technical risks, known to be mainly related to the front end. PXIE will accelerate a…
The \emph{muX} project is conducting a series of muonic X-ray measurements in medium- and high-Z nuclei at PSI, utilizing a high-purity germanium detector array, in-beam muon detectors, and a modern digital data-acquisition system. A novel…
Muon-based facilities offer unique potential to provide capabilities at both the Intensity Frontier with Neutrino Factories and the Energy Frontier with Muon Colliders. They rely on a novel technology with challenging parameters, for which…
The potentially realizable beam power at the Fermilab long-baseline neutrino program has motivated a reinvigorated design and optimization effort for a rapid-cycling synchrotron (RCS) intensity upgrade of the Fermilab proton complex. We…
The Long Baseline Neutrino Experiment (LBNE) will utilize a beamline facility located at Fermilab to carry out a compelling research program in neutrino physics. The facility will aim a wide band beam of neutrinos toward a detector placed…
Recent advances in theoretical atomic physics have enabled large-scale calculation of atomic parameters for a variety of atomic processes with high degree of precision. The development and application of these methods is the aim of the Iron…
The 40-year-old Fermilab Proton Source machines, constituted by the Pre-Injector, Linac and the synchrotron Booster, have been the workhorse of the Fermi National Accelerator Laboratory (Fermilab). During this time, the High Energy Physics…
Fermilab's Integrable Optics Test Accelerator is an electron storage ring designed for testing advanced accelerator physics concepts, including implementation of nonlinear integrable beam optics and experiments on optical stochastic…
A superconducting RF accelerator test facility is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration…
This report documents the physics case for building a 2 MW, 8 GeV superconducting linac proton driver at Fermilab.
The Neutrinos at the Main Injector (NuMI) facility at Fermilab is due to begin operations in late 2004. NuMI will deliver an intense muon neutrino beam of variable energy 2-20 GeV directed into the Earth at 58 mrad for short (~1 km) and…
The Neutrinos at the Main Injector (NuMI) facility at Fermilab is under construction and due to begin operations in late 2004. NuMI will deliver an intense $\nu_{\mu}$ beam of variable energy 2-20 GeV directed into the Earth at 58 mrad.…
The advent of experimental science facilities-instruments and observatories, such as the Large Hadron Collider, the Laser Interferometer Gravitational Wave Observatory, and the upcoming Large Synoptic Survey Telescope-has brought about…
The XMASS project is designed for multiple physics goals using highly-purified liquid xenon scintillator in an ultra-low radioactivity environment. As the first stage of the project, the detector with 835 kg of liquid xenon was constructed…
The variety of applications and especially the unique European XFEL time structure will require adequate instrumentation to be developed to exploit the full potential of the light source. Two-dimensional integrating X-ray detectors with…
A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, and…
We discuss the studies on structure functions at the possible future RCNP facility. At this stage, an electron-proton or proton-proton collider with sqrt{s}=5 - 10 GeV is considered. We explain large-x physics, nuclear modification of…
One of the most challenging tasks in specification engineering for a multi-agent robotic system is to formally specify and architect the system, especially as a multi-agent robotic system is concurrent having concurrent processing, and…
Reliable, high-intensity operation of the Fermilab Accelerator Complex is critical to the success of the Long-Baseline Neutrino Facility and Deep Underground Neutrino Experiment. We describe the requirements and infrastructure necessary to…