Related papers: A note on the paper "Minimizing total tardiness on…
A single machine total weighted tardiness minimization (TWTM) problem in operational planning is considered. The problem is formulated as an NP-hard constrained combinatorial problem, which has no known deterministic polynomial complexity…
We consider the problem of minimizing the total processing time of tardy jobs on a single machine. This is a classical scheduling problem, first considered by [Lawler and Moore 1969], that also generalizes the Subset Sum problem. Recently,…
This paper addresses the problem of scheduling a set of jobs that are released over the time on a set of identical parallel machines, aiming at the minimization of the total weighted completion time. This problem, referred to as $P|r_j|\sum…
The $1|B,r_j|\sum w_jU_j$ scheduling problem takes as input a batch setup time $\Delta$ and a set of $n$ jobs, each having a processing time, a release date, a weight, and a due date; the task is to find a sequence of batches that minimizes…
The starting point of this paper is the problem of scheduling $n$ jobs with processing times and due dates on a single machine so as to minimize the total processing time of tardy jobs, i.e., $1||\sum p_j U_j$. This problem was identified…
A new proof is given for the mathematical equivalence among three $k$-sparse controllability problems of a networked system, which plays key roles in Olshevsky,2014, in the establishment of the NP-hardness of the associated minimal…
The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…
Negatively answering a question posed by Mnich and Wiese (Math. Program. 154(1-2):533-562), we show that P2|prec,$p_j{\in}\{1,2\}$|$C_{\max}$, the problem of finding a non-preemptive minimum-makespan schedule for precedence-constrained jobs…
We consider the classic problem of scheduling a set of n jobs non-preemptively on a single machine. Each job j has non-negative processing time, weight, and deadline, and a feasible schedule needs to be consistent with chain-like precedence…
In this paper we study the long-standing open question regarding the computational complexity of one of the core problems in supply chains management, the periodic joint replenishment problem. This problem has received a lot of attention…
We introduce a parallelizable simplification of Neural Turing Machine (NTM), referred to as P-NTM, which redesigns the core operations of the original architecture to enable efficient scan-based parallel execution. We evaluate the proposed…
The paper considers single-machine scheduling problems with a non-renewable resource. In this setting, we are given a set jobs, each of which is characterized by a processing time, a weight, and the job also has some resource requirement.…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
We show a close connection between structural hardness for $k$-partite graphs and tight inapproximability results for scheduling problems with precedence constraints. Assuming a natural but nontrivial generalisation of the bipartite…
While known algorithms for sensitivity analysis and parameter tuning in probabilistic networks have a running time that is exponential in the size of the network, the exact computational complexity of these problems has not been established…
In this paper, we are interested in parallel identical machine scheduling problems with preemption and release dates in case of a regular criterion to be minimized. We show that solutions having a permutation flow shop structure are…
This paper considers the scheduling of stochastic jobs on parallel identical machines to minimize the expected total weighted completion time. While this is a classical problem with a significant body of research on approximation algorithms…
This paper studies scheduling coupled tasks with exact delays to minimize maximum lateness. The first task has processing time $p>0$ and the second $b_i\geq 0$, also the second needs to start exactly $p$ units of time after the completion…
In a recent paper, Braun, Chung and Graham [1] have addressed a single-processor scheduling problem with time restrictions. Given a fixed integer $B \geq 2$, there is a set of jobs to be processed by a single processor subject to the…
We study graph-theoretic formulations of two fundamental problems in algorithmic differentiation. The first (Structural Optimal Jacobian Accumulation) is that of computing a Jacobian while minimizing multiplications. The second (Minimum…