English
Related papers

Related papers: Project-X: A new high intensity proton accelerator…

200 papers

This paper describes the construction and operational status of an accelerator test facility for Project X. The purpose of this facility is for Project X component development activities that benefit from beam tests and any development…

Accelerator Physics · Physics 2012-08-17 J. Steimel , R. Webber , R. Madrak , D. Wildman , R. Pasquinelli , E. Evans-Peoples

Active discussion on the high energy physics priorities in the US carried out since summer of 2013 resulted in changes in Fermilab plans for future development of the existing accelerator complex. In particular, the scope of Project X was…

Accelerator Physics · Physics 2015-02-09 Paul Derwent , Steve Holmes , Valeri Lebedev

Part 1 of "Project X: Accelerator Reference Design, Physics Opportunities, Broader Impacts". Part 1 contains the volume Preface and a description of the conceptual design for a high-intensity proton accelerator facility being developed to…

The 40-year-old Fermilab Proton Source machines, constituted by the Pre-Injector, Linac and the synchrotron Booster, have been the workhorse of the Fermi National Accelerator Laboratory (Fermilab). During this time, the High Energy Physics…

Accelerator Physics · Physics 2014-09-02 F. G. Garcia , W. Pellico

The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging and often depends on non-invasive techniques. One such…

Accelerator Physics · Physics 2018-03-06 R. Thurman-Keup , M. Alvarez , J. Fitzgerald , C. Lundberg , P. Prieto , J. Zagel , W. Blokland

For Project X, the Fermilab Main Injector will be required to operate with 3 times higher bunch intensity. The plan to study the space charge effects at the injection energy with intense bunches will be discussed.

Accelerator Physics · Physics 2012-08-17 K. Seiya , B. Chase , J. Dey , P. Joireman , I. Kourbanis , A. Yagodnitsyna

The current program at Fermilab involves the construction of a new superconducting linear accelerator (LINAC) to replace the existing warm version. The new LINAC, together with other planned improvements, is in support of proton beam…

Accelerator Physics · Physics 2023-10-03 R. Thurman-Keup , T. Folan , M. Mwaniki , S. Sas-Pawlik

The Neutrinos at the Main Injector (NuMI) facility at Fermilab is due to begin operations in late 2004. NuMI will deliver an intense muon neutrino beam of variable energy 2-20 GeV directed into the Earth at 58 mrad for short (~1 km) and…

High Energy Physics - Experiment · Physics 2008-11-26 Sacha E. Kopp

The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging and often depends on non-invasive techniques. One such…

Accelerator Physics · Physics 2015-11-09 R. Thurman-Keup , M. Alvarez , J. Fitzgerald , C. Lundberg , P. Prieto , M. Roberts , J. Zagel , W. Blokland

Fermilab is planning the construction of a prototype front end of the Project X linac. The Project X Injector Experiment (PXIE) is expected to accelerate 1 mA cw H- beam up to 30 MeV. Some of the major goals of the project are to test a cw…

Accelerator Physics · Physics 2013-01-30 V. A. Lebedev , A. V. Shemyakin , J. Steimel , M. Wendt , B. M. Hanna , L. R. Prost , V. E. Scarpine

We report on the status of the Fermilab accelerator complex, including recent performance, upgrades in progress, and plans for the future. Beam delivery to the neutrino experiments surpassed our goals for the past year. The Proton…

Accelerator Physics · Physics 2016-12-30 M. E. Convery

Fermilab is committed to upgrading its accelerator complex towards the intensity frontier to pursue HEP research in the neutrino sector and beyond. The upgrade has two steps: 1) the Proton Improvement Plan (PIP), which is underway, has its…

Accelerator Physics · Physics 2017-05-04 C. M. Bhat

Fermilab is executing a technology development program to develop a compact yet powerful electron accelerator. We are leveraging R&D breakthroughs in SRF cavities, cost-effective radio-frequency sources, modern cryo-coolers, and high…

Accelerator Physics · Physics 2022-02-17 Jayakar Thangaraj

From 2005 through 2012, the Fermilab Main Injector provided intense beams of 120 GeV protons to produce neutrino beams and antiprotons. Hardware improvements in conjunction with improved diagnostics allowed the system to reach sustained…

Accelerator Physics · Physics 2013-02-01 Bruce C. Brown

The Fermilab accelerator complex delivers intense high-energy proton beams to a variety of fixed-target scientific programs, including a flagship long-baseline neutrino program. With the advent of the Deep Underground Neutrino Experiment…

Accelerator Physics · Physics 2019-09-04 Jeffrey Eldred , Valeri Lebedev , Alexander Valishev

Project-X is the proposed high intensity proton facility to be built at Fermilab, US. Its Superconducting Linac, to be used at first stage of acceleration, will be operated in continuous wave (CW) mode. The Linac is divided into three…

Accelerator Physics · Physics 2012-02-27 A. Saini , K. Ranjan , N. Solyak , S. Mishra , V. Yakovlev

The peak current limit for the Fermilab Linac was recently studied. The purpose was to learn what components of the present Linac can be used for the first stage of a proposed proton driver[1]. For this application the Linac must provide a…

Accelerator Physics · Physics 2007-05-23 M. Popovic , L. Allen , A. Moretti , E. McCrory , C. W. Schmidt , T. Sullivan

For Project X, it is planned to inject a beam of 3x10**11 particles per bunch into the Main Injector. Therefore, at 8-GeV, there will be increased space charge tune shifts and an increased incoherent tune spread. In preparation for these…

Accelerator Physics · Physics 2013-01-30 D. J. Scott , D. Capista , I. Kourbanis , K. Seiya , M. -J. Yang

We describe the status of the Main Injector particle production Experiment (MIPP) at Fermilab which has to date acquired 18 million events of particle interactions using (5 GeV/c-120 GeV/c) $\pi^\pm, K^\pm$ and $p^\pm$ beams on various…

High Energy Physics - Experiment · Physics 2008-11-26 Rajendran Raja

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab's particle accelerator complex to enable the world's most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come.…