Related papers: Santa Claus Schedules Jobs on Unrelated Machines
We study bicriteria versions of Makespan Minimization on Unrelated Machines and Santa Claus by allowing a constrained number of rejections. Given an instance of Makespan Minimization on Unrelated Machines where the optimal makespan for…
We study the restricted case of Scheduling on Unrelated Parallel Machines. In this problem, we are given a set of jobs $J$ with processing times $p_j$ and each job may be scheduled only on some subset of machines $S_j \subseteq M$. The goal…
One of the most important open problems in machine scheduling is the problem of scheduling a set of jobs on unrelated machines to minimize the makespan. The best known approximation algorithm for this problem guarantees an approximation…
In the restricted assignment problem, the input consists of a set of machines and a set of jobs each with a processing time and a subset of eligible machines. The goal is to find an assignment of the jobs to the machines minimizing the…
In the classical problem of scheduling on unrelated parallel machines, a set of jobs has to be assigned to a set of machines. The jobs have a processing time depending on the machine and the goal is to minimize the makespan, that is the…
We consider the problem of scheduling $n$ jobs to minimize the makespan on $m$ unrelated machines, where job $j$ requires time $p_{ij}$ if processed on machine $i$. A classic algorithm of Lenstra et al. yields the best known approximation…
We consider the classical problem of Scheduling on Unrelated Machines. In this problem a set of jobs is to be distributed among a set of machines and the maximum load (makespan) is to be minimized. The processing time $p_{ij}$ of a job $j$…
In this paper we study the relation of two fundamental problems in scheduling and fair allocation: makespan minimization on unrelated parallel machines and max-min fair allocation, also known as the Santa Claus problem. For both of these…
Makespan minimization on unrelated machines is a classic problem in approximation algorithms. No polynomial time $(2-\delta)$-approximation algorithm is known for the problem for constant $\delta> 0$. This is true even for certain special…
We consider a natural generalization of scheduling $n$ jobs on $m$ parallel machines so as to minimize the makespan. In our extension the set of jobs is partitioned into several classes and a machine requires a setup whenever it switches…
The (Non-Preemptive) Throughput Maximization problem is a natural and fundamental scheduling problem. We are given $n$ jobs, where each job $j$ is characterized by a processing time and a time window, contained in a global interval $[0,T)$,…
We consider the classic problem of scheduling jobs with precedence constraints on identical machines to minimize makespan, in the presence of communication delays. In this setting, denoted by $\mathsf{P} \mid \mathsf{prec}, c \mid…
We consider the classic problem of scheduling jobs with precedence constraints on a set of identical machines to minimize the makespan objective function. Understanding the exact approximability of the problem when the number of machines is…
We consider the following special case of minimizing makespan. A set of jobs $J$ and a set of machines $M$ are given. Each job $j \in J$ can be scheduled on a machine from a subset $M_j$ of $M$. The processing time of $j$ is the same on all…
Parallel machine scheduling has been extensively studied in the past decades, with applications ranging from production planning to job processing in large computing clusters. In this work we study some of these fundamental optimization…
We consider a single machine scheduling problem that seeks to minimize a generalized cost function: given a subset of jobs we must order them so as to minimize $\sum f_j(C_j)$, where $C_j$ is the completion time of job $j$ and $f_j$ is a…
We consider the classic problem of scheduling jobs on unrelated machines so as to minimize the weighted sum of completion times. Recently, for a small constant $\varepsilon >0 $, Bansal et al. gave a $(3/2-\varepsilon)$-approximation…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
We study the classical scheduling problem of minimizing the makespan of a set of unit size jobs with precedence constraints on parallel identical machines. Research on the problem dates back to the landmark paper by Graham from 1966 who…
We consider the classic problem of scheduling a set of n jobs non-preemptively on a single machine. Each job j has non-negative processing time, weight, and deadline, and a feasible schedule needs to be consistent with chain-like precedence…