Related papers: A PTAS for Scheduling with Tree Assignment Restric…
Modern platforms are using accelerators in conjunction with standard processing units in order to reduce the running time of specific operations, such as matrix operations, and improve their performance. Scheduling on such hybrid platforms…
A central problem in scheduling is to schedule $n$ unit size jobs with precedence constraints on $m$ identical machines so as to minimize the makespan. For $m=3$, it is not even known if the problem is NP-hard and this is one of the last…
Given a set of clients with demands, the Capacitated Vehicle Routing problem is to find a set of tours that collectively cover all client demand, such that the capacity of each vehicle is not exceeded and such that the sum of the tour…
In the classical problem of scheduling on unrelated parallel machines, a set of jobs has to be assigned to a set of machines. The jobs have a processing time depending on the machine and the goal is to minimize the makespan, that is the…
We investigate the scheduling of $n$ jobs divided into $c$ classes on $m$ identical parallel machines. For every class there is a setup time which is required whenever a machine switches from the processing of one class to another class.…
We consider a natural generalization of classical scheduling problems in which using a time unit for processing a job causes some time-dependent cost which must be paid in addition to the standard scheduling cost. We study the scheduling…
We present the first polynomial-time approximation schemes (PTASes) for the following subset-connectivity problems in edge-weighted graphs of bounded genus: Steiner tree, low-connectivity survivable-network design, and subset TSP. The…
This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio.…
In this paper we study the classical scheduling problem of minimizing the total weighted completion time on a single machine with the constraint that one specific job must be scheduled at a specified position. We give dynamic programs with…
The Capacitated Vehicle Routing problem is to find a minimum-cost set of tours that collectively cover clients in a graph, such that each tour starts and ends at a specified depot and is subject to a capacity bound on the number of clients…
In the problem called single resource constraint scheduling, we are given $m$ identical machines and a set of jobs, each needing one machine to be processed as well as a share of a limited renewable resource $R$. A schedule of these jobs is…
We study the restricted case of Scheduling on Unrelated Parallel Machines. In this problem, we are given a set of jobs $J$ with processing times $p_j$ and each job may be scheduled only on some subset of machines $S_j \subseteq M$. The goal…
We study the classical scheduling problem of minimizing the makespan of a set of unit size jobs with precedence constraints on parallel identical machines. Research on the problem dates back to the landmark paper by Graham from 1966 who…
We show a close connection between structural hardness for $k$-partite graphs and tight inapproximability results for scheduling problems with precedence constraints. Assuming a natural but nontrivial generalisation of the bipartite…
The problem of scheduling jobs on parallel machines (identical, uniform, or unrelated), under incompatibility relation modeled as a block graph, under the makespan optimality criterion, is considered in this paper. No two jobs that are in…
We present a unified framework for designing deterministic monotone polynomial time approximation schemes (PTAS's) for a wide class of scheduling problems on uniformly related machines. This class includes (among others) minimizing the…
In the Scheduling Machines with Capacity Constraints problem, we are given k identical machines, each of which can process at most m_i jobs. M jobs are also given, where job j has a non-negative processing time length t_j >= 0. The task is…
We achieve a (randomized) polynomial-time approximation scheme (PTAS) for the Steiner Forest Problem in doubling metrics. Before our work, a PTAS is given only for the Euclidean plane in [FOCS 2008: Borradaile, Klein and Mathieu]. Our PTAS…
We consider the problem of scheduling $n$ jobs on $m$ uniform machines while minimizing the makespan ($Q||C_{\max}$) and maximizing the minimum completion time ($Q||C_{\min}$) in an online setting with migration of jobs. In this online…
We design the first polynomial time approximation schemes (PTASs) for the Minimum Betweenness problem in tournaments and some related higher arity ranking problems. This settles the approximation status of the Betweenness problem in…