Effort estimation is a complex area in decision-making, and is influenced by a diversity of factors that could increase the estimation error. The effects on effort estimation accuracy of having obsolete requirements in specifications have…
Development effort is an undeniable part of the project management which considerably influences the success of project. Inaccurate and unreliable estimation of effort can easily lead to the failure of project. Due to the special…
Requirements volatility is a major issue in software development, causing problems such as higher defect density, project delays and cost overruns. Software architecture that guides the overall vision of software product, is one of the…
The continuous evolution of software projects necessitates the implementation of changes to enhance performance and reduce defects. This research explores effective strategies for learning and implementing useful changes in software…
[Context and Motivation]: The quality of requirements specifications impacts subsequent, dependent software engineering activities. Requirements quality defects like ambiguous statements can result in incomplete or wrong features and even…
The need for change in project requirements is necessary for every organization due to change in technology,change in government policy,and change of customer or stakeholders requirements.Requirement Change Management RCM is not an easy…
Software has always been considered as malleable. Changes to software requirements are inevitable during the development process. Despite many software engineering advances over several decades, requirements changes are a source of project…
Effort estimation is a key factor for software project success, defined as delivering software of agreed quality and functionality within schedule and budget. Traditionally, effort estimation has been used for planning and tracking project…
Workarounds enable users to achieve goals despite system limitations but expose design flaws, reduce productivity, risk compromising data quality, and cause inconsistencies. This study investigates how users employ workarounds when the data…
Context: Changing a software application with many build-time configuration settings may introduce unexpected side-effects. For example, a change intended to be specific to a platform (e.g., Windows) or product configuration (e.g.,…
Background: Requirements Changes (RCs) -- the additions/modifications/deletions of functional/non-functional requirements in software products -- are challenging for software practitioners to handle. Handling some changes may significantly…
Developers interrupting their participation in a project might slowly forget critical information about the code, such as its intended purpose, structure, the impact of external dependencies, and the approach used for implementation.…
According to a study of The Standish Group International, 44% of software projects cost more and last longer than expected. More accurate the effort estimation is; the better the enterprise gets organized and the more the software project…
The overall objective of Requirements Engineering is to specify, in a systematic way, a system that satisfies the expectations of its stakeholders. Despite tremendous effort in the field, recent studies demonstrate this is objective is not…
Software systems usually operate in a dynamic context where their requirements change continuously and new requirements emerge frequently. A single requirement hardly exists in isolation: it is related to other requirements and to the…
Like software, requirements evolve and change frequently during the development process. Refactoring is the process of reorganising software without changing its behaviour, to make it easier to understand and modify. We propose refactoring…
Model composition plays a central role in many software engineering activities such as evolving models to add new features and reconciling conflicting design models developed in parallel by different development teams. As model composition…
Background: Requirement engineering is often considered a critical activity in system development projects. The increasing complexity of software, as well as number and heterogeneity of stakeholders, motivate the development of methods and…
Changes, they use to say, are the only constant in life. Everything changes rapidly around us, and more and more key to survival is the ability to rapidly adapt to changes. This consideration applies to many aspects of our lives. Strangely…
In collaborative software development, multiple contributors frequently change the source code in parallel to implement new features, fix bugs, refactor existing code, and make other changes. These simultaneous changes need to be merged…