This paper addresses the optimization of scheduling for workers at a logistics depot using a combination of genetic algorithm and simulated annealing algorithm. The efficient scheduling of permanent and temporary workers is crucial for…
This work addresses the problem of assigning periodic tasks to workers in a balanced way, i.e., so that each worker performs every task with the same frequency over the long term. The input consists of a list of tasks to be repeated weekly…
In this work, we investigate the problem of order batching and picker routing in warehouse storage areas. These problems are known to be capital and labour intensive, and often contribute to a sizable fraction of warehouse operating costs.…
Robotic assembly planning enables architects to explicitly account for the assembly process during the design phase, and enables efficient building methods that profit from the robots' different capabilities. Previous work has addressed…
Current-day data centers and high-volume cloud services employ a broad set of heterogeneous servers. In such settings, client requests typically arrive at multiple entry points, and dispatching them to servers is an urgent distributed…
Handling the ever-increasing complexity of mesh generation codes along with the intricacies of newer hardware often results in codes that are both difficult to comprehend and maintain. Different facets of codes such as thread management and…
Metaheuristics are general methods that guide application of concrete heuristic(s) to problems that are too hard to solve using exact algorithms. However, even though a growing body of literature has been devoted to their statistical…
In this paper, a heuristic for a heterogeneous min-max multi-vehicle multi-depot traveling salesman problem is proposed, wherein heterogeneous vehicles start from given depot locations and need to cover a given set of targets. In the…
The integration of Reinforcement Learning (RL) with heuristic methods is an emerging trend for solving optimization problems, which leverages RL's ability to learn from the data generated during the search process. One promising approach is…
Boolean satisfiability (SAT) is a fundamental NP-complete problem with many applications, including automated planning and scheduling. To solve large instances, SAT solvers have to rely on heuristics, e.g., choosing a branching variable in…
Minimizing the number of reshuffling operations at maritime container terminals incorporates the Pre-Marshalling Problem (PMP) as an important problem. Based on an analysis of existing solution approaches we develop new heuristics utilizing…
Fair algorithm evaluation is conditioned on the existence of high-quality benchmark datasets that are non-redundant and are representative of typical optimization scenarios. In this paper, we evaluate three heuristics for selecting diverse…
How to generate instances with relevant properties and without bias remains an open problem of critical importance for a fair comparison of heuristics. In the context of scheduling with precedence constraints, the instance consists of a…
We consider multi-dimensional assignment problems in a probabilistic setting. Our main results are: (i) A new efficient algorithm for the 3-dimensional planar problem, based on enumerating and selecting from a set of "alternating-path…
Coordinating agents to complete a set of tasks with intercoupled temporal and resource constraints is computationally challenging, yet human domain experts can solve these difficult scheduling problems using paradigms learned through years…
Scientific workflows have been predominantly used for complex and large scale data analysis and scientific computation/automation and the need for robust workflow scheduling techniques has grown considerably. But, most of the existing…
This paper addresses the problem of managing perishable inventory under multiple sources of uncertainty, including stochastic demand, unreliable supplier fulfillment, and probabilistic product shelf life. We develop a discrete-event…
We study the scheduling of jobs on a single parallel-batching machine with non-identical job sizes and incompatible job families. Jobs from the same family have the same processing time and can be loaded into a batch, as long as the batch…
In this paper, we study a new Workforce Scheduling and Routing Problem, denoted Multiperiod Workforce Scheduling and Routing Problem with Dependent Tasks. In this problem, customers request services from a company. Each service is composed…