Related papers: Energy Efficient Scheduling via Partial Shutdown
This paper considers parallel machine scheduling with incompatibilities between jobs. The jobs form a graph and no two jobs connected by an edge are allowed to be assigned to the same machine. In particular, we study the case where the…
We consider the problem of scheduling on a single processor a given set of n jobs. Each job j has a workload w_j and a release time r_j. The processor can vary its speed and hibernate to reduce energy consumption. In a schedule minimizing…
We are given a set of $n$ jobs that have to be executed on a set of $m$ speed-scalable machines that can vary their speeds dynamically using the energy model introduced in [Yao et al., FOCS'95]. Every job $j$ is characterized by its release…
We study the restricted case of Scheduling on Unrelated Parallel Machines. In this problem, we are given a set of jobs $J$ with processing times $p_j$ and each job may be scheduled only on some subset of machines $S_j \subseteq M$. The goal…
Many applications require the collection of data on different variables or measurements over many system performance metrics. We term those broadly as measures or variables. Often data collection along each measure incurs a cost, thus it is…
In this paper the problem of scheduling of jobs on parallel machines under incompatibility relation is considered. In this model a binary relation between jobs is given and no two jobs that are in the relation can be scheduled on the same…
This paper considers a combination of the joint replenishment problem with single machine scheduling. There is a single resource, which is required by all the jobs, and a job can be started at time point $t$ on the machine if and only the…
The amalgamation of Internet of Things and the smart grid enables the energy optimal scheduling of appliances based on user needs and dynamic energy prices. Additionally, progress in local storage technology calls for exploiting additional…
The under exploitation of the available resources risks to be one of the main problems for a computing center. The growing demand of computational power necessarily entails more complex approaches in the management of the computing…
Consider the classical Min-Sum Set Cover problem: We are given a universe $\mathcal{U}$ of $n$ elements and a collection $\mathcal{S}$ of $k$ subsets of $\mathcal{U}$. Moreover, a cost function is associated with each set. The goal is to…
Scheduling query execution plans is a particularly complex problem in shared-nothing parallel systems, where each site consists of a collection of local time-shared (e.g., CPU(s) or disk(s)) and space-shared (e.g., memory) resources and…
We consider the control of discrete-time linear dynamical systems using sparse inputs where we limit the number of active actuators at every time step. We develop an algorithm for determining a sparse actuator schedule that ensures the…
Recent trends of technology have explored a numerous applications of cloud services, which require a significant amount of energy. In the present scenario, most of the energy sources are limited and have a greenhouse effect on the…
As the gap between compute and I/O performance tends to grow, modern High-Performance Computing (HPC) architectures include a new resource type: an intermediate persistent fast memory layer, called burst buffers. This is just one of many…
We consider the two-parallel machines scheduling problem, with the aim of minimizing the maximum lateness and the makespan. Formally, the problem is defined as follows. We have to schedule a set J of n jobs on two identical machines. Each…
We study the classical scheduling problem of minimizing the makespan of a set of unit size jobs with precedence constraints on parallel identical machines. Research on the problem dates back to the landmark paper by Graham from 1966 who…
We study the approximability of two related machine scheduling problems. In the late work minimization problem, there are identical parallel machines and the jobs have a common due date. The objective is to minimize the late work, defined…
This paper studies a single-machine scheduling problem with a non-renewable resource (NR-SSP) and total weighted completion time criterion. The non-renewable resource is consumed when the machine starts processing a job. We consider the…
We consider scheduling problems for unit jobs with release times, where the number or size of the gaps in the schedule is taken into consideration, either in the objective function or as a constraint. Except for a few papers on energy…
We consider a natural scheduling problem which arises in many distributed computing frameworks. Jobs with diverse resource requirements (e.g. memory requirements) arrive over time and must be served by a cluster of servers, each with a…