Related papers: Parallel machine scheduling with precedence constr…
Scheduling a set of jobs over a collection of machines is a fundamental problem that needs to be solved millions of times a day in various computing platforms: in operating systems, in large data clusters, and in data centers. Along with…
This article is devoted to propose some lower and upper bounds for the coupled-tasks scheduling problem in presence of compatibility constraints according to classical complexity hypothesis ($\mathcal{P} \neq \mathcal{NP}$,…
In this paper, we consider the problem of scheduling jobs on parallel identical machines, where the processing times of jobs are uncertain: only interval bounds of processing times are known. The optimality criterion of a schedule is the…
Scheduling query execution plans is a particularly complex problem in shared-nothing parallel systems, where each site consists of a collection of local time-shared (e.g., CPU(s) or disk(s)) and space-shared (e.g., memory) resources and…
Numerical solutions to the Eikonal equation are computed using variants of the fast marching method, the fast sweeping method, and the fast iterative method. In this paper, we provide a unified view of these algorithms that highlights their…
The Chance-Constrained Parallel Machine Scheduling Problem (CC-PMSP) assigns jobs with uncertain processing times to machines, ensuring that each machine's availability constraints are met with a certain probability. We present a…
Coflow is a recently proposed network abstraction for data-parallel computing applications. This paper considers scheduling coflows with precedence constraints in identical parallel networks, such as to minimize the total weighted…
Over the past few years, self-attention is shining in the field of deep learning, especially in the domain of natural language processing(NLP). Its impressive effectiveness, along with ubiquitous implementations, have aroused our interest…
This work introduces a natural variant of the online machine scheduling problem on unrelated machines, which we refer to as the favorite machine model. In this model, each job has a minimum processing time on a certain set of machines,…
This paper considers the basic problem of scheduling jobs online with preemption to maximize the number of jobs completed by their deadline on $m$ identical machines. The main result is an $O(1)$ competitive deterministic algorithm for any…
When a computer system schedules jobs there is typically a significant cost associated with preempting a job during execution. This cost can be from the expensive task of saving the memory's state and loading data into and out of memory. It…
In this work we study the problem of scheduling tasks with dependencies in multiprocessor architectures where processors have different speeds. We present the preemptive algorithm "Save-Energy" that given a schedule of tasks it post…
We consider the classic problem of scheduling jobs with precedence constraints on identical machines to minimize makespan, in the presence of communication delays. In this setting, denoted by $\mathsf{P} \mid \mathsf{prec}, c \mid…
We consider the two-parallel machines scheduling problem, with the aim of minimizing the maximum lateness and the makespan. Formally, the problem is defined as follows. We have to schedule a set J of n jobs on two identical machines. Each…
We study the approximability of two related machine scheduling problems. In the late work minimization problem, there are identical parallel machines and the jobs have a common due date. The objective is to minimize the late work, defined…
Negatively answering a question posed by Mnich and Wiese (Math. Program. 154(1-2):533-562), we show that P2|prec,$p_j{\in}\{1,2\}$|$C_{\max}$, the problem of finding a non-preemptive minimum-makespan schedule for precedence-constrained jobs…
We describe a method for time-critical decision making involving sequential tasks and stochastic processes. The method employs several iterative refinement routines for solving different aspects of the decision making problem. This paper…
Given n jobs with release dates, deadlines and processing times we consider the problem of scheduling them on m parallel machines so as to minimize the total energy consumed. Machines can enter a sleep state and they consume no energy in…
We study a natural variant of scheduling that we call \emph{partial scheduling}: In this variant an instance of a scheduling problem along with an integer $k$ is given and one seeks an optimal schedule where not all, but only $k$ jobs, have…
In this work, we study the task of scheduling jobs on a single machine with sequence dependent family setup times under the goal of minimizing the makespan, that is, the completion time of the last job in the schedule. This notoriously…