Related papers: The 12 GeV JLab Upgrade Project
A 15-30 GeV continuous beam electron facility has been proposed by nuclear physicists in Europe to study how color forces build up hadrons from quarks and gluons. This project and its physics case are briefly reviewed. The recommendations…
Research activities on laser plasma accelerators are paved by many significant breakthroughs. This review article provides an opportunity to show the incredible evolution of this field of research which has, in record time, allowed…
Fermilab is upgrading its Booster synchrotron to increase ramp rate and intensity. This is part of the Proton Improvement Plan (PIP-II) that will allow the Main Injector to achieve proton beam power of 1.2 MW within the next few years. This…
LHCb is a forward spectrometer experiment dedicated to the study of new physics in the decays of beauty and charm hadrons produced in proton collisions at the Large Hadron Collider (LHC) at CERN. The VErtex LOcator (VELO) is the microstrip…
The Solenoidal Large Intensity Device (SoLID) is a new experimental apparatus planned for Hall A at the Thomas Jefferson National Accelerator Facility (JLab). SoLID will combine large angular and momentum acceptance with the capability to…
IJCLab has been leading the development and deployment of low-$\beta$ Superconducting Radio Frequency (SRF) cavities for proton and heavy ion accelerators. We are launching an electron accelerator project for sustainable Energy Recovery…
The Large Hadron Collider will soon undergo an upgrade to increase its luminosity by a factor of ~10 [1]. A crucial part of this upgrade will be replacement of the NbTi focusing magnets with Nb3Sn magnets that achieve a ~50% increase in the…
Recent results from JLab on the electromagnetic excitation of nucleon resonances are presented, and confronted with theoretical predictions. Preliminary data in the search for undiscovered states are discussed as well.
The Proton Improvement Plan-II (PIP-II) [1] has been developed at Fermilab to provide powerful proton beams to the laboratorys experiments. An 800-MeV superconducting linear accelerator-a centerpiece of the project-is currently under…
In order to meet the needs of Fermilabs planned post-collider experimental program, the total proton throughput of the 8 GeV Booster accelerator must be nearly doubled within the next two years. A system of 48 ramped corrector magnets has…
The luminosity of the electron-proton collider, HERA, will be increased by a factor of five during the long shutdown starting September 2000. At the same time longitudinal lepton beam polarisation will be provided for the collider…
Fermilab is executing a technology development program to develop a compact yet powerful electron accelerator. We are leveraging R&D breakthroughs in SRF cavities, cost-effective radio-frequency sources, modern cryo-coolers, and high…
Within the general frame of the upgrade of the collider DAFNE to the neutron-antineutron energy threshold (2-2.5 GeV c.m.), modifications and different options for the accelerator design are discussed and a possible lattice for the Main…
We propose to create a secondary beam of neutral kaons in Hall D at Jefferson Lab to be used with the GlueX experimental setup for strange hadron spectroscopy. The superior CEBAF electron beam will enable a flux on the order of $1\times…
Studies of the spectrum of hadrons and their structure in experiments with electromagnetic probes offer unique insight into many facets of the strong interaction in the regime of large quark-gluon running coupling, {\it i.e.} the regime of…
The Future Circular Collider (FCC) Study is aimed at assessing the physics potential and the technical feasibility of a new collider with centre-of-mass energies, in the hadron-hadron collision mode, seven times larger than the nominal LHC…
For Project X, it is planned to inject a beam of 3 10**11 particles per bunch into the Main Injector. To prepare for this by studying the effects of higher intensity bunches in the Main Injector it is necessary to perform coalescing at 8…
KEK electron linac was upgraded to 8 GeV for the KEK B-Factory (KEKB) project. During the commissioning of the upgraded linac, even continuing SOR ring injections, we had achieved a primary electron beam with 10-nC (6.24 x 10^10) per bunch…
I review some central physics opportunities at the 15 ... 30 GeV continuous beam electron accelerator ELFE, proposed to be built in conjunction with the DESY linear collider. Our present detailed knowledge of single parton distributions in…
The Advanced Wakefield Experiment (AWAKE) is an accelerator R&D experiment at CERN using, for the first time, a high-energy proton bunch to drive wakefields in plasma and accelerating electrons to the GeV energy scale. The principle of the…