Related papers: Best insertion algorithm for resource-constrained …
Resource constrained project scheduling is an important combinatorial optimisation problem with many practical applications. With complex requirements such as precedence constraints, limited resources, and finance-based objectives, finding…
The resource constrained multi-mode multi-project scheduling problem (RCMMMPSP) is a notoriously difficult combinatorial optimization problem. For a given set of activities, feasible execution mode assignments and execution starting times…
We consider the Continuous Energy-Constrained Scheduling Problem (CECSP). A set of jobs has to be processed on a continuous, shared resource. A schedule for a job consists of a start time, completion time, and a resource consumption…
This study investigates scheduling strategies for the stochastic resource-constrained project scheduling problem with maximal time lags (SRCPSP/max)). Recent advances in Constraint Programming (CP) and Temporal Networks have reinvoked…
Nowadays, DevOps pipelines of huge projects are getting more and more complex. Each job in the pipeline might need different requirements including specific hardware specifications and dependencies. To achieve minimal makespan, developers…
In this paper we consider several constrained activity scheduling problems in the time and space domains, like finding activity orderings which optimize the values of several objective functions (time scheduling) or finding optimal…
This study presents a system integration approach for planning schedules, sequences, tasks, and motions for reconfigurable robots to automatically disassemble constrained structures in a non-destructive manner. Such systems must adapt their…
In this paper, we investigate the Resource-Constrained Project Scheduling Problem (RCPSP) with time-of-use energy tariffs (TOU) and machine states, a variant of RCPSP for production scheduling where energy price is part of the criteria and…
Real-life parallel machine scheduling problems can be characterized by: (i) limited information about the exact task duration at scheduling time, and (ii) an opportunity to reschedule the remaining tasks each time a task processing is…
Optimizing schedules in real-world settings often requires considering workload constraints, specially for human resources, to ensure regulatory compliance, impose rest periods, or level the workload over the working horizon. This paper…
The Capacitated Lot-Sizing Problem (CLSP) and its variants are important and challenging optimization problems. Constructive heuristics are known to be the most intuitive and fastest methods for finding good feasible solutions for the CLSPs…
Scheduling precedence-constrained tasks under shared renewable resources is central to modern computing platforms. The Resource Investment Problem (RIP) models this setting by minimizing the cost of provisioned renewable resources under…
We study the single machine scheduling problem with the objective to minimize the total weight of late jobs. It is assumed that the processing times of jobs are not exactly known at the time when a complete schedule must be dispatched.…
We consider the class of single machine scheduling problems with the objective to minimize the weighted number of late jobs, under the assumption that completion due-dates are not known precisely at the time when decision-maker must provide…
Stochastic sequential decision making often requires hierarchical structure in the problem where each high-level action should be further planned with primitive states and actions. In addition, many real-world applications require a plan…
Multi-mode resource-constrained project scheduling problems (MRCPSPs) are classified as NP-hard problems, in which a task has different execution modes characterized by different resource requirements. Estimation of distribution algorithm…
The scheduling of production resources (such as associating jobs to machines) plays a vital role for the manufacturing industry not only for saving energy but also for increasing the overall efficiency. Among the different job scheduling…
While previous work on energy-efficient algorithms focused on assumption that tasks can be assigned to any processor, we initially study the problem of task scheduling on restricted parallel processors. The objective is to minimize the…
We introduce a parallel machine scheduling problem in which the processing times of jobs are not given in advance but are determined by a system of linear constraints. The objective is to minimize the makespan, i.e., the maximum job…
Resource constrained job scheduling is a hard combinatorial optimisation problem that originates in the mining industry. Off-the-shelf solvers cannot solve this problem satisfactorily in reasonable timeframes, while other solution methods…