Towards Operation Proof Obligation Generation for VDM
Software Engineering
2025-06-19 v1
Abstract
All formalisms have the ability to ensure that their models are internally consistent. Potential inconsistencies are generally highlighted by assertions called proof obligations, and the generation of these obligations is an important role of the tools that support the method. This capability has been available for VDM tools for many years. However, support for obligation generation for explicit operation bodies has always been limited. This work describes the current state of work to address this, showing the capabilities so far and highlighting the work remaining.
Cite
@article{arxiv.2506.12858,
title = {Towards Operation Proof Obligation Generation for VDM},
author = {Nick Battle and Peter Gorm Larsen},
journal= {arXiv preprint arXiv:2506.12858},
year = {2025}
}
Comments
Presented at the 23rd Overture workshop, June 2025 (arXiv:cs/2506.08680)