English

Time Delay Analysis of the Lensed Quasar SDSS J1001+5027

Cosmology and Nongalactic Astrophysics 2017-05-23 v2

Abstract

We modify the algorithm we proposed before in Aghamousa & Shafieloo (2015) on time delay estimation of the strong lens systems incorporating weighted cross-correlation and weighted summation of correlation coefficients. We show the high performance of this algorithm by applying it on Time Delay Challenge (TDC1) simulated data. We apply then our proposed method on the light curves of the lensed quasar SDSS J1001+5027 since this system has been well studied by other groups to compare our results with their findings. In this work we propose a new estimator namely "mirror" estimator along with a list of criteria for reliability test of estimation. Our mirror estimator results to 117.13.7+7.1-117.1^{+7.1}_{-3.7} and 117.18.8+7.2-117.1^{+7.2}_{-8.8} using simple Monte Carlo simulations and simulated light curves provided by Rathna Kumar et al. (2013) respectively. Although TDC1 simulations do not reflect the properties of SDSS J1001+5027 light curves, using these simulations results to smaller uncertainty which shows the higher quality observations can lead to substantially more precise time delay estimation. Our time delay estimation is in agreement with findings of the other groups for this strong lens system and the difference in the size of the error bars reflects the importance of appropriate light curve simulations.

Keywords

Cite

@article{arxiv.1603.06331,
  title  = {Time Delay Analysis of the Lensed Quasar SDSS J1001+5027},
  author = {Amir Aghamousa and Arman Shafieloo},
  journal= {arXiv preprint arXiv:1603.06331},
  year   = {2017}
}

Comments

19 pages, 5 figures, 1 table, discussions extended, methodology improved, main results unchanged, matches the final version published in ApJ