English

Tau/Charm Factory Accelerator Report

Accelerator Physics 2013-10-28 v1

Abstract

The present Report concerns the current status of the Italian Tau/Charm accelerator project and in particular discusses the issues related to the lattice design, to the accelerators systems and to the associated conventional facilities. The project aims at realizing a variable energy Flavor Factory between 1 and 4.6 GeV in the center of mass, and succeeds to the SuperB project from which it inherits most of the solutions proposed in this document. The work comes from a cooperation involving the INFN Frascati National Laboratories accelerator experts, the young newcomers, mostly engineers, of the Cabibbo Lab consortium and key collaborators from external laboratories.

Cite

@article{arxiv.1310.6944,
  title  = {Tau/Charm Factory Accelerator Report},
  author = {M. E. Biagini and R. Boni and M. Boscolo and A. Chiarucci and R. Cimino and A. Clozza and A. Drago and S. Guiducci and C. Ligi and G. Mazzitelli and R. Ricci and C. Sanelli and M. Serio and A. Stella and S. Tomassini and S. Bini and F. Cioeta and D. Cittadino and M. D'Agostino and M. Del Franco and A. Delle Piane and E. Di Pasquale and G. Frascadore and S. Gazzana and R. Gargana and S. Incremona and A. Michelotti and L. Sabbatini and G. Schillaci and M. Sedita and P. Raimondi and R. Petronzio and E. Paoloni and S. M. Liuzzo and N. Carmignani and M. Pivi},
  journal= {arXiv preprint arXiv:1310.6944},
  year   = {2013}
}

Comments

150 pages

R2 v1 2026-06-22T01:54:14.711Z