English

Priority-based task reassignments in hierarchical 2D mesh-connected systems using tableaux

Distributed, Parallel, and Cluster Computing 2014-03-24 v4

Abstract

Task reassignments in 2D mesh-connected systems (2D-MSs) have been researched for several decades. We propose a hierarchical 2D mesh-connected system (2D-HMS) in order to exploit the regular nature of a 2D-MS. In our approach priority-based task assignments and reassignments in a 2D-HMS are represented by tableaux and their algorithms. We show how task relocations for a priority-based task reassignment in a 2D-HMS are reduced to a jeu de taquin slide.

Cite

@article{arxiv.1107.1866,
  title  = {Priority-based task reassignments in hierarchical 2D mesh-connected systems using tableaux},
  author = {Dohan Kim},
  journal= {arXiv preprint arXiv:1107.1866},
  year   = {2014}
}

Comments

Preprint of an article published in Discrete Mathematics, Algorithms and Applications Vol. 6, No. 2 (2014) 1450022 (16 pages), (c) World Scientific Publishing Company, DOI: 10.1142/S1793830914500220

R2 v1 2026-06-21T18:34:37.294Z