English

Optimum Launch Power in Multiband Systems

Signal Processing 2024-07-12 v1

Abstract

We investigate the residual throughput penalty due to ISRS, after power-optimization, in multiband systems. We show it to be mild. We also revisit the launch power optimization 3-dB rule. We find that using it is possible but not advisable due to increased GSNR non-uniformity.

Cite

@article{arxiv.2407.08309,
  title  = {Optimum Launch Power in Multiband Systems},
  author = {Yanchao Jiang and Fabrizio Forghieri and Stefano Piciaccia and Gabriella Bosco and Pierluigi Poggiolini},
  journal= {arXiv preprint arXiv:2407.08309},
  year   = {2024}
}

Comments

The paper has been accepted for publication at ECOC 2024

R2 v1 2026-06-28T17:36:56.866Z