English

On Frame Asynchronous Coded Slotted ALOHA: Asymptotic, Finite Length, and Delay Analysis

Information Theory 2016-11-29 v2 math.IT

Abstract

We consider a frame asynchronous coded slotted ALOHA (FA-CSA) system for uncoordinated multiple access, where users join the system on a slot-by-slot basis according to a Poisson random process and, in contrast to standard frame synchronous CSA (FS-CSA), users are not frame-synchronized. We analyze the performance of FA-CSA in terms of packet loss rate and delay. In particular, we derive the (approximate) density evolution that characterizes the asymptotic performance of FA-CSA when the frame length goes to infinity. We show that, if the receiver can monitor the system before anyone starts transmitting, a boundary effect similar to that of spatially-coupled codes occurs, which greatly improves the iterative decoding threshold. Furthermore, we derive tight approximations of the error floor (EF) for the finite frame length regime, based on the probability of occurrence of the most frequent stopping sets. We show that, in general, FA-CSA provides better performance in both the EF and waterfall regions as compared to FS-CSA. Moreover, FA-CSA exhibits better delay properties than FS-CSA.

Keywords

Cite

@article{arxiv.1606.03242,
  title  = {On Frame Asynchronous Coded Slotted ALOHA: Asymptotic, Finite Length, and Delay Analysis},
  author = {Erik Sandgren and Alexandre Graell i Amat and Fredrik Brännström},
  journal= {arXiv preprint arXiv:1606.03242},
  year   = {2016}
}

Comments

13 pages, 12 figures. arXiv admin note: substantial text overlap with arXiv:1604.06293

R2 v1 2026-06-22T14:22:22.846Z