English

Non-Wire Alternatives to Capacity Expansion

Optimization and Control 2018-03-30 v3 Systems and Control

Abstract

Distributed energy resources (DERs) can serve as non-wire alternatives to capacity expansion by managing peak load to avoid or defer traditional expansion projects. In this paper, we study a planning problem that co-optimizes DERs investment and operation (e.g., energy efficiency, energy storage, demand response, solar photovoltaic) and the timing of capacity expansion. We formulate the problem as a large scale (in the order of millions of variables because we model the operation of DERs over a period of decades) non-convex optimization problem. Despite its non-convexities, we find its optimal solution by decomposing it using the Dantzig-Wolfe Decomposition Algorithm and solving a series of small linear problems. Finally, we present a real planning problem at the University of Washington Seattle Campus.

Keywords

Cite

@article{arxiv.1711.01349,
  title  = {Non-Wire Alternatives to Capacity Expansion},
  author = {Jesus E. Contreras-Ocaña and Uzma Siddiqi and Baosen Zhang},
  journal= {arXiv preprint arXiv:1711.01349},
  year   = {2018}
}

Comments

This document is an online supplement for a paper submitted to the 2018 Power and Energy Society General Meeting

R2 v1 2026-06-22T22:35:48.060Z