Multiplicative scale uncertainties in the unified approach for constructing confidence intervals
Nuclear Experiment
2009-06-10 v2 Data Analysis, Statistics and Probability
Abstract
We have investigated how uncertainties in the estimation of the detection efficiency affect the 90% confidence intervals in the unified approach for constructing confidence intervals. The study has been conducted for experiments where the number of detected events is large and can be described by a Gaussian probability density function. We also assume the detection efficiency has a Gaussian probability density and study the range of the relative uncertainties between 0 and 30%. We find that the confidence intervals provide proper coverage over a wide signal range and increase smoothly and continuously from the intervals that ignore scale uncertainties with a quadratic dependence on .
Cite
@article{arxiv.0812.1120,
title = {Multiplicative scale uncertainties in the unified approach for constructing confidence intervals},
author = {E. S. Smith},
journal= {arXiv preprint arXiv:0812.1120},
year = {2009}
}
Comments
22 pages, 7 figures, 2 tables