The problem of multi-area interchange scheduling under system uncertainty is considered. A new scheduling technique is proposed for a multi-proxy bus system based on stochastic optimization that captures uncertainty in renewable generation and stochastic load. In particular, the proposed algorithm iteratively optimizes the interface flows using a multidimensional demand and supply functions. Optimality and convergence are guaranteed for both synchronous and asynchronous scheduling under nominal assumptions.
@article{arxiv.1611.05012,
title = {Multi-Area Interchange Scheduling under Uncertainty},
author = {Yuting Ji and Lang Tong},
journal= {arXiv preprint arXiv:1611.05012},
year = {2016}
}