English

Multi-Area Interchange Scheduling under Uncertainty

Optimization and Control 2016-11-16 v1 Applications

Abstract

The problem of multi-area interchange scheduling under system uncertainty is considered. A new scheduling technique is proposed for a multi-proxy bus system based on stochastic optimization that captures uncertainty in renewable generation and stochastic load. In particular, the proposed algorithm iteratively optimizes the interface flows using a multidimensional demand and supply functions. Optimality and convergence are guaranteed for both synchronous and asynchronous scheduling under nominal assumptions.

Keywords

Cite

@article{arxiv.1611.05012,
  title  = {Multi-Area Interchange Scheduling under Uncertainty},
  author = {Yuting Ji and Lang Tong},
  journal= {arXiv preprint arXiv:1611.05012},
  year   = {2016}
}
R2 v1 2026-06-22T16:53:28.615Z