English

Maintenance scheduling in a railway corricdor

Optimization and Control 2019-10-24 v1 Data Structures and Algorithms

Abstract

We investigate a novel scheduling problem which is motivated by an application in the Australian railway industry. Given a set of maintenance jobs and a set of train paths over a railway corridor with bidirectional traffic, we seek a schedule of jobs such that a minimum number of train paths are cancelled due to conflict with the job schedule. We show that the problem is NP-complete in general. In a special case of the problem when every job under any schedule just affects one train path, and the speed of trains is bounded from above and below, we show that the problem can be solved in polynomial time. Moreover, in another special case of the problem where the traffic is unidirectional, we show that the problem can be solved in time O(n4)O(n^4).

Keywords

Cite

@article{arxiv.1910.10348,
  title  = {Maintenance scheduling in a railway corricdor},
  author = {Saman Eskandarzadeh and Thomas Kalinowski and Hamish Waterer},
  journal= {arXiv preprint arXiv:1910.10348},
  year   = {2019}
}
R2 v1 2026-06-23T11:52:08.527Z