At the beginning of the design and construction of the STAR Detector, the collaboration assigned a team of physicists and engineers the responsibility of coordinating the construction of the detector. This group managed the general space assignments for each sub-system and coordinated the assembly and planning for the detector. Furthermore, as this group was the only STAR group with the responsibility of looking at the system as a whole, the collaboration assigned it several tasks that spanned the different sub-detectors. These items included grounding, rack layout, cable distribution, electrical, power and water, and safety systems. This paper describes these systems and their performance.
Cite
@article{arxiv.nucl-ex/0205008,
title = {Integration and Conventional Systems at STAR},
author = {H. S. Matis and R. L. Brown and W. Christie and W. R. Edwards and R. Jared and B. Minor and P. Salz},
journal= {arXiv preprint arXiv:nucl-ex/0205008},
year = {2014}
}
Comments
17 pages, 6 figures, Contribution to a NIM Volume Dedicated to the Detectors and the Accelerator at RHIC