English

Exploration of models for a cargo assembly planning problem

Optimization and Control 2015-04-03 v1

Abstract

We consider a real-world cargo assembly planning problem arising in a coal supply chain. The cargoes are built on the stockyard at a port terminal from coal delivered by trains. Then the cargoes are loaded onto vessels. Only a limited number of arriving vessels is known in advance. The goal is to minimize the average delay time of the vessels over a long planning period. We model the problem in the MiniZinc constraint programming language and design a large neighbourhood search scheme. The effects of various optional constraints are investigated. Some of the optional constraints expand the model's scope toward a system view (berth capacity, port channel). An adaptive scheme for a greedy heuristic from the literature is proposed and compared to the constraint programming approach.

Keywords

Cite

@article{arxiv.1504.00445,
  title  = {Exploration of models for a cargo assembly planning problem},
  author = {G. Belov and N. Boland and M. W. P. Savelsbergh and P. J. Stuckey},
  journal= {arXiv preprint arXiv:1504.00445},
  year   = {2015}
}

Comments

24 pages, 9 figures, 12 tables

R2 v1 2026-06-22T09:08:36.594Z