English

EPC Framework for BESS Projects

Systems and Control 2025-06-17 v1 Systems and Control

Abstract

Battery Energy Storage Systems (BESS) are critical for modern power networks, supporting grid services such as frequency regulation, peak shaving, and black start. Delivering a BESS under an Engineering, Procurement, and Construction (EPC) model requires a concise methodology that balances regulatory compliance, technical details, and schedule efficiency. This paper presents a streamlined, five step EPC framework covering feasibility assessment, permitting, procurement, construction, and commissioning. A Danish demonstration (the BOSS project on Bornholm) serves as a case study.

Keywords

Cite

@article{arxiv.2506.13281,
  title  = {EPC Framework for BESS Projects},
  author = {Zeenat Hameed and Chresten Træholt},
  journal= {arXiv preprint arXiv:2506.13281},
  year   = {2025}
}

Comments

Submitted to a conference

R2 v1 2026-07-01T03:19:17.501Z