English

Delay Analysis of Multichannel Parallel Contention Tree Algorithms (MP-CTA)

Information Theory 2017-08-01 v1 math.IT

Abstract

Contention tree algorithm is initially invented as a solution to improve the stable throughput problem of Slotted ALOHA in multiple access schemes. Even though the throughput is stabilized in tree algorithms, the delay of requests may grow to infinity with respect to the arrival rate of the system. Delay depends heavily on the exploration of the tree structure, i.e., breadth search, or depth search. Breadth search is necessary for faster exploration of tree. The analytical probability distribution of delay, which is available mostly for depth search, is not generalizable to all breadth search. In this paper we fill this gap through though arbitrary grouping of branches and including this in the delay analysis. This enables obtaining the delay analysis of any contention tree algorithm that runs a breadth first search exploration. We show through simulations that the analysis is in agreement with the realizations.

Keywords

Cite

@article{arxiv.1707.09754,
  title  = {Delay Analysis of Multichannel Parallel Contention Tree Algorithms (MP-CTA)},
  author = {Murat Gürsu and Alberto Martínez Alba and Wolfgang Kellerer},
  journal= {arXiv preprint arXiv:1707.09754},
  year   = {2017}
}

Comments

38 pages, 6 figures, submitted to Transactions on Information Theory with id IT-17-0597

R2 v1 2026-06-22T21:02:02.312Z