Critical Inertia Estimation for the Three U.S. Interconnections
Abstract
The rapid integration of inverter-based resources (IBRs) is reducing system inertia across U.S. power grids, raising concerns about frequency stability following large contingencies. This paper presents a simulation-based assessment of critical inertia, defined as the minimum system inertia required to prevent first-stage under-frequency load shedding (UFLS) after the largest credible contingency, across the three major U.S. interconnections: Eastern Interconnection (EI), WECC, and ERCOT. Reduced-inertia scenarios are created by progressively replacing synchronous generators with IBRs, and dynamic simulations are performed using full-scale PSS/E and PowerWorld models. The results show that ERCOT reaches critical inertia at approximately 58 percent IBR penetration, compared with above 90 percent for WECC and approximately 67 to 68 percent for EI. Current IBR shares in the U.S. portions of EI, WECC, and ERCOT are 16 percent, 33 percent, and 44 percent, respectively, indicating varying proximity to critical inertia thresholds. These findings highlight the importance of full dynamic simulations to accurately estimate critical inertia and guide transmission planning under high renewable penetration scenarios.
Cite
@article{arxiv.2608.00883,
title = {Critical Inertia Estimation for the Three U.S. Interconnections},
author = {Jiaojiao Dong and Sneha Fariha and Rocio Uria Martinez and Wen Wang and Yilu Liu},
journal= {arXiv preprint arXiv:2608.00883},
year = {2026}
}