CMS RPC Activities During LHC LS-2

Instrumentation and Detectors 2020-12-30 v1 High Energy Physics - Experiment

Abstract

The second LHC long shutdown period (LS2) is an important opportunity for the CMS Resistive Plate Chambers (RPC) to complete their consolidation and upgrade projects. The consolidation includes detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. All services for the RPC Phase-2 upgrade, namely RE3/1 and RE4/1, were anticipated for installation to LS2. This paper summarises the RPC system maintenance and upgrade activities.

Cite

@article{arxiv.2005.12534,
  title  = {CMS RPC Activities During LHC LS-2},
  author = {Mehar Ali Shah},
  journal= {arXiv preprint arXiv:2005.12534},
  year   = {2020}
}

Comments

5 pages, 5 figures, 15th Workshop on Resistive Plate Chambers and related detectors (RPC2020) Roma, Italy