English

Case study on scheduling cyclic conveyor belts

Optimization and Control 2019-12-23 v1

Abstract

We optimise the production line of a manufacturing company in southern Germany in order to improve throughput. While the optimisation problem is NP-hard in general, analysing production data we find that in practice the problem can be solved very efficiently by aggressive generation of random machine schedules.

Keywords

Cite

@article{arxiv.1912.09724,
  title  = {Case study on scheduling cyclic conveyor belts},
  author = {Felix Bock and Henning Bruhn},
  journal= {arXiv preprint arXiv:1912.09724},
  year   = {2019}
}
R2 v1 2026-06-23T12:52:11.632Z