English

BEPCII/BESIII Upgrade and the Prospective Physics

Instrumentation and Detectors 2008-11-26 v1

Abstract

The Status of BEPCII/BESIII upgrade is described, BEPCII is designed to reach a luminosity of 1033/cm2s110^{33}/cm^{-2}s^{-1} at c. m. energy of 3.89GeV, and BESIII detector is fully rebuilt. The project is on track and is progressing well. The machine and detector are expected to commission together at the late half of 2007, and start to take some engineer run end of 2007 or beginning of 2008.

Cite

@article{arxiv.physics/0605158,
  title  = {BEPCII/BESIII Upgrade and the Prospective Physics},
  author = {Weiguo Li},
  journal= {arXiv preprint arXiv:physics/0605158},
  year   = {2008}
}

Comments

5 pages, 2 figures, Flavor Physics and CP Violation Confeerence, Vancouver, 2006

R2 v1 2026-07-22T19:10:19.164Z