English

Beam Dump problem and Neutrino Factory Based on a $e^+e^-$ Linear Collider

Accelerator Physics 2015-06-23 v1 High Energy Physics - Phenomenology

Abstract

The beam of an e+ee^+e^- Linear Collider after a collision at the main interaction point can be utilized to construct the neutrino factory with exceptional parameters. We also discuss briefly possible applications of some elements of the proposed scheme to standard fixed target experiments and new experiments with νμN\nu_\mu N interactions.

Keywords

Cite

@article{arxiv.1411.3295,
  title  = {Beam Dump problem and Neutrino Factory Based on a $e^+e^-$ Linear Collider},
  author = {I. F. Ginzburg},
  journal= {arXiv preprint arXiv:1411.3295},
  year   = {2015}
}

Comments

6 pages, 1 figure. arXiv admin note: substantial text overlap with arXiv:hep-ph/0507335

R2 v1 2026-06-22T06:56:39.963Z