English

Beam Coupling Impedance of the LHC TCTP Collimators

Accelerator Physics 2012-07-17 v1

Abstract

As part of an upgrade to the LHC collimation system, 8 TCTP and 1 TCSG collimators are proposed to replace existing collimators in the collimation system. In an effort to review all equipment placed in the accelerator complex for potential side effects due to collective effects and beam-equipment interactions, beam coupling impedance simulations are carried out in both the time-domain and frequency-domain of the full TCTP design. Particular attention is paid to trapped modes that may induce beam instabilities and beam-induced heating due to cavity modes of the device.

Keywords

Cite

@article{arxiv.1207.3681,
  title  = {Beam Coupling Impedance of the LHC TCTP Collimators},
  author = {Hugo Day and Fritz Caspers and Alessandro Dallocchio and Luca Gentini and Alexej Grudiev and Elias Metral and Roger Jones and Benoit Salvant},
  journal= {arXiv preprint arXiv:1207.3681},
  year   = {2012}
}